Causeymire

Causeymire is operational in Highland with a recorded capacity of 48.3 MW, and has been generating since 2004-06-01.

48.3 MW
Capacity
as recorded in REPD
Operational
Status
since 2004-06-01
Wind Onshore
Technology
Innogy (formerly RWE npower)
Highland
Authority
Scotland

Planning and build timeline

Application submitted2001-11-01
Permission granted2002-11-19
13 months after submission
Operational2004-06-01
18 months after consent

Highland’s record on onshore wind

Highland has decided 99 onshore wind schemes and approved 63%, taking a median of 13.9 months. See every onshore wind scheme decision in Highland

Other built sites within 15 km

SiteMWDistance
Pulteney Distillery
Biomass (dedicated) · Operational
3.51 km
Achairn
Wind Onshore · Operational
6.26.8 km
Wathegar 2 Wind Farm
Wind Onshore · Operational
18.57.7 km
Wathegar wind farm
Wind Onshore · Operational
108.2 km
Camster II
Wind Onshore · Under Construction
368.4 km
Bilbster Wind Farm
Wind Onshore · Operational
3.99.6 km
Camster
Wind Onshore · Operational
5011.5 km
Burn of Whilk
Wind Onshore · Operational
22.511.9 km

How big is Causeymire?

Causeymire has a recorded installed capacity of 48.3 MW. That figure is the capacity registered in REPD, which is the scheme as consented — the metered output of a site can differ.

Who operates Causeymire?

REPD records the operator as Innogy (formerly RWE npower). Ownership of built renewable assets changes hands regularly and REPD is published quarterly, so treat this as the operator of record rather than confirmation of who owns it today.

When was Causeymire approved and built?

The application was submitted on 2001-11-01. Permission was granted on 2002-11-19, 13 months later. The site became operational on 2004-06-01, 18 months after consent.

Source: Renewable Energy Planning Database (REPD), Department for Energy Security and Net Zero, Open Government Licence v3.0, plus planning designation boundaries from planning.data.gov.uk (England only). REPD is published quarterly and covers schemes of roughly 150 kW and above. Capacity is the installed capacity on record, not metered generation. Operator is the operator of record at the last extract, not confirmation of present ownership. Reference 3108.

Novarly Parcel · official public data, read properly · parcel.novarly.com

All sites · Screen your own site · Planning by council