Renewable sites › Wambrook Farm
Wambrook Farm
Wambrook Farm is operational in Somerset with a recorded capacity of 4.1 MW, and has been generating since 2015-08-15.
Planning and build timeline
| Application submitted | 2014-08-13 |
| Permission granted | 2014-11-28 4 months after submission |
| Operational | 2015-08-15 9 months after consent |
What this site sits on
The recorded coordinate falls on land surveyed as Grade 3 agricultural land. The published survey does not split Grade 3 into 3a and 3b, so this alone does not settle whether the land counts as best and most versatile.
- Nutrient-neutrality catchment — River Axe SAC
REPD gives one representative coordinate per scheme, not the site boundary, so this describes the point on record rather than the whole site — a large site can straddle a designation edge. Boundaries come from planning.data.gov.uk, which publishes for England only.
Somerset’s record on solar
Somerset has decided 147 solar farms and approved 86%, taking a median of 3 months. See every solar farm decision in Somerset →
Other built sites within 15 km
| Site | MW | Distance |
|---|---|---|
Chard Solar Park Solar Photovoltaics · Operational | 3 | 3.4 km |
JB Wheaton Battery · Operational | 8.8 | 5.2 km |
Marshwood Farm Solar Photovoltaics · Operational | 1.8 | 5.3 km |
Goldenhaye Field Solar Farm Solar Photovoltaics · Operational | 2 | 5.8 km |
Axe View Solar Farm Solar Photovoltaics · Operational | 5 | 7.3 km |
Parsonage Barn (extension) Solar Photovoltaics · Operational | 7.6 | 9.1 km |
Beechgrove Farm Solar Photovoltaics · Operational | 4 | 10.4 km |
Lower Coombe Farm (Bean Field) Solar Photovoltaics · Operational | 1 | 10.6 km |
How big is Wambrook Farm?
Wambrook Farm has a recorded installed capacity of 4.1 MW. That figure is the capacity registered in REPD, which is the scheme as consented — the metered output of a site can differ.
Who operates Wambrook Farm?
REPD records the operator as Sunsave 19 (Wambrook)/ Vogt Solar. Ownership of built renewable assets changes hands regularly and REPD is published quarterly, so treat this as the operator of record rather than confirmation of who owns it today.
When was Wambrook Farm approved and built?
The application was submitted on 2014-08-13. Permission was granted on 2014-11-28, 4 months later. The site became operational on 2015-08-15, 9 months after consent.
Source: Renewable Energy Planning Database (REPD), Department for Energy Security and Net Zero, Open Government Licence v3.0, plus planning designation boundaries from planning.data.gov.uk (England only). REPD is published quarterly and covers schemes of roughly 150 kW and above. Capacity is the installed capacity on record, not metered generation. Operator is the operator of record at the last extract, not confirmation of present ownership. Reference 2226.
Novarly Parcel · official public data, read properly · parcel.novarly.com