Renewable sitesMarshwood Farm

Marshwood Farm

Marshwood Farm is operational in Somerset with a recorded capacity of 1.8 MW, and has been generating since 2015-06-26.

1.8 MW
Capacity
as recorded in REPD
Operational
Status
since 2015-06-26
Solar Photovoltaics
Technology
KWTN Solar
Somerset
Authority
England

Planning and build timeline

Application submitted2014-11-05
Permission granted2015-01-12
2 months after submission
Operational2015-06-26
5 months after consent

What this site sits on

The recorded coordinate falls on land surveyed as Grade 4 agricultural land.

REPD gives one representative coordinate per scheme, not the site boundary, so this describes the point on record rather than the whole site — a large site can straddle a designation edge. Boundaries come from planning.data.gov.uk, which publishes for England only.

Somerset’s record on solar

Somerset has decided 147 solar farms and approved 86%, taking a median of 3 months. See every solar farm decision in Somerset

Other built sites within 15 km

SiteMWDistance
JB Wheaton
Battery · Operational
8.80.2 km
Axe View Solar Farm
Solar Photovoltaics · Operational
53.4 km
Goldenhaye Field Solar Farm
Solar Photovoltaics · Operational
24.4 km
Chard Solar Park
Solar Photovoltaics · Operational
35.2 km
Wambrook Farm
Solar Photovoltaics · Operational
4.15.3 km
Beechgrove Farm
Solar Photovoltaics · Operational
45.5 km
Stonebarrow Farm
Solar Photovoltaics · Operational
86.1 km
Wyld Meadow Solar Farm
Solar Photovoltaics · Operational
4.86.7 km

How big is Marshwood Farm?

Marshwood Farm has a recorded installed capacity of 1.8 MW. That figure is the capacity registered in REPD, which is the scheme as consented — the metered output of a site can differ.

Who operates Marshwood Farm?

REPD records the operator as KWTN Solar. Ownership of built renewable assets changes hands regularly and REPD is published quarterly, so treat this as the operator of record rather than confirmation of who owns it today.

When was Marshwood Farm approved and built?

The application was submitted on 2014-11-05. Permission was granted on 2015-01-12, 2 months later. The site became operational on 2015-06-26, 5 months after consent.

Source: Renewable Energy Planning Database (REPD), Department for Energy Security and Net Zero, Open Government Licence v3.0, plus planning designation boundaries from planning.data.gov.uk (England only). REPD is published quarterly and covers schemes of roughly 150 kW and above. Capacity is the installed capacity on record, not metered generation. Operator is the operator of record at the last extract, not confirmation of present ownership. Reference 4752.

Novarly Parcel · official public data, read properly · parcel.novarly.com