Upper Wheedlemont Farm

Upper Wheedlemont Farm is an operational 1.7 MW onshore wind farm in Aberdeenshire, generating since 11 November 2017. Planning permission was granted on 4 October 2012, 35 months after submission. Operator of record: J & A�Wilson Ltd.

1.7 MW
Capacity
as recorded in REPD
Operational
Status
since 11 November 2017
Wind Onshore
Technology
J & A�Wilson Ltd
Aberdeenshire
Authority
Scotland

Planning and build timeline

Application submitted4 November 2009
Permission granted4 October 2012
35 months after submission
Operational11 November 2017
61 months after consent

Screening a site of your own?

RedlineUK · £39

Aberdeenshire approves 69% of onshore wind schemes. Redline puts that number, and everything else the record holds, against your own boundary: the authority’s actual approval rate and decision times, every designation inside the red line, agricultural grade, 1 m LIDAR earthworks, how contested the grid is, and yield with a P90 — before you spend on a consultant.

Screen a site here£39

Arrives prefilled with Upper Wheedlemont Farm’s recorded coordinate — swap in your own postcode or coordinates.

Consent ClockUK · Free

Granted years ago. Still not built. Every consented onshore wind scheme in the UK, computed against its statutory commencement deadline — which consents are about to lapse, and where.

Open Consent Clock →

Aberdeenshire’s record on onshore wind

Aberdeenshire has decided 118 onshore wind schemes and approved 69%, taking a median of 12.7 months. See every onshore wind scheme decision in Aberdeenshire

Other built sites within 15 km

SiteMWDistance
Solar Photovoltaics · Operational
3.83.3 km
Solar Photovoltaics · Operational
1.23.5 km
Wind Onshore · Operational
2.63.8 km
Wind Onshore · Operational
374.8 km

How big is Upper Wheedlemont Farm?

Upper Wheedlemont Farm has a recorded installed capacity of 1.7 MW. That figure is the capacity registered in REPD, which is the scheme as consented — the metered output of a site can differ.

Who operates Upper Wheedlemont Farm?

REPD records the operator as J & A�Wilson Ltd. Ownership of built renewable assets changes hands regularly and REPD is published quarterly, so treat this as the operator of record rather than confirmation of who owns it today.

When was Upper Wheedlemont Farm approved and built?

The application was submitted on 4 November 2009. Permission was granted on 4 October 2012, 35 months later. The site became operational on 11 November 2017, 61 months after consent.

Source: Renewable Energy Planning Database (REPD), Department for Energy Security and Net Zero, Open Government Licence v3.0, plus planning designation boundaries from planning.data.gov.uk (England only). REPD is published quarterly and covers schemes of roughly 150 kW and above. Capacity is the installed capacity on record, not metered generation. Operator is the operator of record at the last extract, not confirmation of present ownership. Reference 3776.