Renewable sites › Cairnmore Solar Park (extension)
Cairnmore Solar Park (extension)
Cairnmore Solar Park (extension) is an operational 1.2 MW solar farm in Aberdeenshire, generating since 15 September 2015. Planning permission was granted on 23 June 2015, 2 months after submission. Operator of record: GPV Rhynie.
Planning and build timeline
| Application submitted | 5 May 2015 |
| Permission granted | 23 June 2015 2 months after submission |
| Operational | 15 September 2015 3 months after consent |
Screening a site of your own?
Aberdeenshire approves 100% of solar farms. Redline puts that number, and everything else the record holds, against your own boundary: the authority’s actual approval rate and decision times, every designation inside the red line, agricultural grade, 1 m LIDAR earthworks, how contested the grid is, and yield with a P90 — before you spend on a consultant.
Arrives prefilled with Cairnmore Solar Park (extension)’s recorded coordinate — swap in your own postcode or coordinates.
Aberdeenshire’s record on solar
Aberdeenshire has decided 39 solar farms and approved 100%, taking a median of 2.1 months. See every solar farm decision in Aberdeenshire →
Other built sites within 15 km
| Site | MW | Distance |
|---|---|---|
Solar Photovoltaics · Operational | 3.8 | 0.2 km |
Wind Onshore · Operational | 2.6 | 1 km |
Wind Onshore · Operational | 1.7 | 3.5 km |
Wind Onshore · Operational | 37 | 7 km |
Wind Onshore · Operational | 18.4 | 11.8 km |
Wind Onshore · Operational | 9.6 | 13.5 km |
How big is Cairnmore Solar Park (extension)?
Cairnmore Solar Park (extension) has a recorded installed capacity of 1.2 MW. That figure is the capacity registered in REPD, which is the scheme as consented — the metered output of a site can differ.
Who operates Cairnmore Solar Park (extension)?
REPD records the operator as GPV Rhynie. Ownership of built renewable assets changes hands regularly and REPD is published quarterly, so treat this as the operator of record rather than confirmation of who owns it today.
When was Cairnmore Solar Park (extension) approved and built?
The application was submitted on 5 May 2015. Permission was granted on 23 June 2015, 2 months later. The site became operational on 15 September 2015, 3 months after consent.
Source: Renewable Energy Planning Database (REPD), Department for Energy Security and Net Zero, Open Government Licence v3.0, plus planning designation boundaries from planning.data.gov.uk (England only). REPD is published quarterly and covers schemes of roughly 150 kW and above. Capacity is the installed capacity on record, not metered generation. Operator is the operator of record at the last extract, not confirmation of present ownership. Reference 5945.
Novarly Parcel · official public data, read properly · parcel.novarly.com
All sites · Screen your own site · Planning by council · Coal mining search by postcode