Cairnmore Solar Park (extension) is an operational 1.2 MW solar farm in Aberdeenshire, generating since 15 September 2015. Planning permission was granted on 23 June 2015, 2 months after submission. Operator of record: GPV Rhynie.

1.2 MW
Capacity
as recorded in REPD
Operational
Status
since 15 September 2015
Solar Photovoltaics
Technology
GPV Rhynie
Aberdeenshire
Authority
Scotland

Planning and build timeline

Application submitted5 May 2015
Permission granted23 June 2015
2 months after submission
Operational15 September 2015
3 months after consent

Screening a site of your own?

RedlineUK · £39

Aberdeenshire approves 100% of solar farms. Redline puts that number, and everything else the record holds, against your own boundary: the authority’s actual approval rate and decision times, every designation inside the red line, agricultural grade, 1 m LIDAR earthworks, how contested the grid is, and yield with a P90 — before you spend on a consultant.

Screen a site here£39

Arrives prefilled with Cairnmore Solar Park (extension)’s recorded coordinate — swap in your own postcode or coordinates.

Consent ClockUK · Free

Granted years ago. Still not built. Every consented solar farm in the UK, computed against its statutory commencement deadline — which consents are about to lapse, and where.

Open Consent Clock →

Aberdeenshire’s record on solar

Aberdeenshire has decided 39 solar farms and approved 100%, taking a median of 2.1 months. See every solar farm decision in Aberdeenshire

Other built sites within 15 km

SiteMWDistance
Solar Photovoltaics · Operational
3.80.2 km
Wind Onshore · Operational
2.61 km
Wind Onshore · Operational
1.73.5 km
Wind Onshore · Operational
377 km
Wind Onshore · Operational
18.411.8 km
Wind Onshore · Operational
9.613.5 km

How big is Cairnmore Solar Park (extension)?

Cairnmore Solar Park (extension) has a recorded installed capacity of 1.2 MW. That figure is the capacity registered in REPD, which is the scheme as consented — the metered output of a site can differ.

Who operates Cairnmore Solar Park (extension)?

REPD records the operator as GPV Rhynie. Ownership of built renewable assets changes hands regularly and REPD is published quarterly, so treat this as the operator of record rather than confirmation of who owns it today.

When was Cairnmore Solar Park (extension) approved and built?

The application was submitted on 5 May 2015. Permission was granted on 23 June 2015, 2 months later. The site became operational on 15 September 2015, 3 months after consent.

Source: Renewable Energy Planning Database (REPD), Department for Energy Security and Net Zero, Open Government Licence v3.0, plus planning designation boundaries from planning.data.gov.uk (England only). REPD is published quarterly and covers schemes of roughly 150 kW and above. Capacity is the installed capacity on record, not metered generation. Operator is the operator of record at the last extract, not confirmation of present ownership. Reference 5945.

Novarly Parcel · official public data, read properly · parcel.novarly.com

All sites · Screen your own site · Planning by council · Coal mining search by postcode