Novarly ParcelRenewable sites

Renewable sitesTurweston Solar Farm

Turweston Solar Farm

Turweston Solar Farm is operational in Buckinghamshire with a recorded capacity of 16.7 MW, and has been generating since 2014-12-19.

16.7 MW
Capacity
as recorded in REPD
Operational
Status
since 2014-12-19
Solar Photovoltaics
Technology
INRG Solar
Buckinghamshire
Authority
England

Planning and build timeline

Application submitted2013-06-14
Permission granted2013-09-10
3 months after submission
Operational2014-12-19
15 months after consent

What this site sits on

The recorded coordinate falls on land surveyed as Grade 3 agricultural land. The published survey does not split Grade 3 into 3a and 3b, so this alone does not settle whether the land counts as best and most versatile.

REPD gives one representative coordinate per scheme, not the site boundary, so this describes the point on record rather than the whole site — a large site can straddle a designation edge. Boundaries come from planning.data.gov.uk, which publishes for England only.

Buckinghamshire’s record on solar

Buckinghamshire has decided 59 solar farms and approved 90%, taking a median of 3 months. See every solar farm decision in Buckinghamshire

Other built sites within 15 km

SiteMWDistance
Hall Farm
Solar Photovoltaics · Operational
5.14 km
Shelswell Park Solar Farm
Solar Photovoltaics · Operational
56.6 km
Gawcott Fields Farm
Solar Photovoltaics · Operational
9.28.5 km
Buckingham Tesco Superstore
Solar Photovoltaics · Operational
0.29.8 km
Handley Park
Solar Photovoltaics · Operational
510.2 km
Shacks Barn Solar Farm
Solar Photovoltaics · Operational
510.3 km
Culworth House Solar Farm
Solar Photovoltaics · Operational
310.9 km
Ardley Fields Farm Landfill Site
Landfill Gas · Operational
1.812.2 km

How big is Turweston Solar Farm?

Turweston Solar Farm has a recorded installed capacity of 16.7 MW. That figure is the capacity registered in REPD, which is the scheme as consented — the metered output of a site can differ.

Who operates Turweston Solar Farm?

REPD records the operator as INRG Solar. Ownership of built renewable assets changes hands regularly and REPD is published quarterly, so treat this as the operator of record rather than confirmation of who owns it today.

When was Turweston Solar Farm approved and built?

The application was submitted on 2013-06-14. Permission was granted on 2013-09-10, 3 months later. The site became operational on 2014-12-19, 15 months after consent.

Source: Renewable Energy Planning Database (REPD), Department for Energy Security and Net Zero, Open Government Licence v3.0, plus planning designation boundaries from planning.data.gov.uk (England only). REPD is published quarterly and covers schemes of roughly 150 kW and above. Capacity is the installed capacity on record, not metered generation. Operator is the operator of record at the last extract, not confirmation of present ownership. Reference 2081.

Novarly Parcel · official public data, read properly · parcel.novarly.com

All sites · Screen your own site · Planning by council