Shelswell Park Solar Farm

Shelswell Park Solar Farm is an operational 5 MW solar farm in Cherwell, generating since 22 March 2013. Planning permission was granted on 20 May 2011, 3 months after submission. Operator of record: Anesco.

5 MW
Capacity
as recorded in REPD
Operational
Status
since 22 March 2013
Solar Photovoltaics
Technology
Anesco
Cherwell
Authority
England

Planning and build timeline

Application submitted7 February 2011
Permission granted20 May 2011
3 months after submission
Operational22 March 2013
22 months after consent

Screening a site of your own?

RedlineUK · £39

Cherwell approves 100% of solar farms. Redline puts that number, and everything else the record holds, against your own boundary: the authority’s actual approval rate and decision times, every designation inside the red line, agricultural grade, 1 m LIDAR earthworks, how contested the grid is, and yield with a P90 — before you spend on a consultant.

Screen a site here£39

Arrives prefilled with Shelswell Park Solar Farm’s recorded coordinate — swap in your own postcode or coordinates.

Consent ClockUK · Free

Granted years ago. Still not built. Every consented solar farm in the UK, computed against its statutory commencement deadline — which consents are about to lapse, and where.

Open Consent Clock →

What this site sits on

The recorded coordinate falls on land surveyed as Grade 2 agricultural land.

REPD gives one representative coordinate per scheme, not the site boundary, so this describes the point on record rather than the whole site — a large site can straddle a designation edge. Boundaries come from planning.data.gov.uk, which publishes for England only.

Cherwell’s record on solar

Cherwell has decided 36 solar farms and approved 100%, taking a median of 2.4 months. See every solar farm decision in Cherwell

Other built sites within 15 km

SiteMWDistance
Solar Photovoltaics · Operational
16.76.6 km
Landfill Gas · Operational
1.87.2 km
Solar Photovoltaics · Operational
9.27.8 km
Solar Photovoltaics · Operational
5.19.2 km
Solar Photovoltaics · Operational
0.29.4 km
Solar Photovoltaics · Under Construction
0.69.7 km
EfW Incineration · Operational
2210.4 km
Landfill Gas · Operational
11.211.8 km

How big is Shelswell Park Solar Farm?

Shelswell Park Solar Farm has a recorded installed capacity of 5 MW. That figure is the capacity registered in REPD, which is the scheme as consented — the metered output of a site can differ.

Who operates Shelswell Park Solar Farm?

REPD records the operator as Anesco. Ownership of built renewable assets changes hands regularly and REPD is published quarterly, so treat this as the operator of record rather than confirmation of who owns it today.

When was Shelswell Park Solar Farm approved and built?

The application was submitted on 7 February 2011. Permission was granted on 20 May 2011, 3 months later. The site became operational on 22 March 2013, 22 months after consent.

Source: Renewable Energy Planning Database (REPD), Department for Energy Security and Net Zero, Open Government Licence v3.0, plus planning designation boundaries from planning.data.gov.uk (England only). REPD is published quarterly and covers schemes of roughly 150 kW and above. Capacity is the installed capacity on record, not metered generation. Operator is the operator of record at the last extract, not confirmation of present ownership. Reference 1552.

Novarly Parcel · official public data, read properly · parcel.novarly.com

All sites · Screen your own site · Planning by council · Coal mining search by postcode