Ardley Fields Farm Landfill Site is an operational 1.8 MW landfill gas site in Cherwell, generating since 1 December 1996. Planning permission was granted on 31 January 1996, 6 months after submission. Operator of record: Haul Waste Limited.

1.8 MW
Capacity
as recorded in REPD
Operational
Status
since 1 December 1996
Landfill Gas
Technology
Haul Waste Limited
Cherwell
Authority
England

Planning and build timeline

Application submitted16 August 1995
Permission granted31 January 1996
6 months after submission
Operational1 December 1996
10 months after consent

Screening a site of your own?

RedlineUK · £39

Redline runs the record on your own boundary in Cherwell: the authority’s actual approval rate and decision times, every designation inside the red line, agricultural grade, 1 m LIDAR earthworks, how contested the grid is, and yield with a P90 — before you spend on a consultant.

Screen a site here£39

Arrives prefilled with Ardley Fields Farm Landfill Site’s recorded coordinate — swap in your own postcode or coordinates.

Consent ClockUK · Free

Granted years ago. Still not built. Every consented solar, battery or onshore wind scheme in the UK, computed against its statutory commencement deadline — which consents are about to lapse, and where.

Open Consent Clock →

What this site sits on

The recorded coordinate falls on land surveyed as Grade 3 agricultural land. The published survey does not split Grade 3 into 3a and 3b, so this alone does not settle whether the land counts as best and most versatile.

REPD gives one representative coordinate per scheme, not the site boundary, so this describes the point on record rather than the whole site — a large site can straddle a designation edge. Boundaries come from planning.data.gov.uk, which publishes for England only.

Other built sites within 15 km

SiteMWDistance
Solar Photovoltaics · Under Construction
0.66.7 km
EfW Incineration · Operational
247.1 km
Solar Photovoltaics · Operational
57.2 km
Solar Photovoltaics · Operational
12.58.6 km
Solar Photovoltaics · Operational
58.8 km
Solar Photovoltaics · Operational
18.39.8 km
Solar Photovoltaics · Operational
1311.1 km
Solar Photovoltaics · Operational
811.3 km

How big is Ardley Fields Farm Landfill Site?

Ardley Fields Farm Landfill Site has a recorded installed capacity of 1.8 MW. That figure is the capacity registered in REPD, which is the scheme as consented — the metered output of a site can differ.

Who operates Ardley Fields Farm Landfill Site?

REPD records the operator as Haul Waste Limited. Ownership of built renewable assets changes hands regularly and REPD is published quarterly, so treat this as the operator of record rather than confirmation of who owns it today.

When was Ardley Fields Farm Landfill Site approved and built?

The application was submitted on 16 August 1995. Permission was granted on 31 January 1996, 6 months later. The site became operational on 1 December 1996, 10 months after consent.

Source: Renewable Energy Planning Database (REPD), Department for Energy Security and Net Zero, Open Government Licence v3.0, plus planning designation boundaries from planning.data.gov.uk (England only). REPD is published quarterly and covers schemes of roughly 150 kW and above. Capacity is the installed capacity on record, not metered generation. Operator is the operator of record at the last extract, not confirmation of present ownership. Reference 587.