Tullo Wind Farm South (Ext.)
Tullo Wind Farm South (Ext.) is an operational 10 MW onshore wind farm in Aberdeenshire, generating since 1 July 2014. Planning permission was granted on 13 September 2012, 10 months after submission. Operator of record: Eneco.
Planning and build timeline
| Application submitted | 28 November 2011 |
| Permission granted | 13 September 2012 10 months after submission |
| Operational | 1 July 2014 22 months after consent |
Screening a site of your own?
Aberdeenshire approves 69% of onshore wind schemes. Redline puts that number, and everything else the record holds, against your own boundary: the authority’s actual approval rate and decision times, every designation inside the red line, agricultural grade, 1 m LIDAR earthworks, how contested the grid is, and yield with a P90 — before you spend on a consultant.
Arrives prefilled with Tullo Wind Farm South (Ext.)’s recorded coordinate — swap in your own postcode or coordinates.
Aberdeenshire’s record on onshore wind
Aberdeenshire has decided 118 onshore wind schemes and approved 69%, taking a median of 12.7 months. See every onshore wind scheme decision in Aberdeenshire →
Other built sites within 15 km
| Site | MW | Distance |
|---|---|---|
Wind Onshore · Operational | 25 | 1.1 km |
Wind Onshore · Operational | 7.5 | 1.9 km |
Wind Onshore · Operational | 7.5 | 2.1 km |
Wind Onshore · Operational | 4.6 | 2.5 km |
Biomass (dedicated) · Operational | 1.2 | 9.8 km |
Wind Onshore · Operational | 7.65 | 10.6 km |
Wind Onshore · Operational | 4.6 | 10.6 km |
Wind Onshore · Operational | 7.7 | 10.9 km |
How big is Tullo Wind Farm South (Ext.)?
Tullo Wind Farm South (Ext.) has a recorded installed capacity of 10 MW. That figure is the capacity registered in REPD, which is the scheme as consented — the metered output of a site can differ.
Who operates Tullo Wind Farm South (Ext.)?
REPD records the operator as Eneco. Ownership of built renewable assets changes hands regularly and REPD is published quarterly, so treat this as the operator of record rather than confirmation of who owns it today.
When was Tullo Wind Farm South (Ext.) approved and built?
The application was submitted on 28 November 2011. Permission was granted on 13 September 2012, 10 months later. The site became operational on 1 July 2014, 22 months after consent.
Source: Renewable Energy Planning Database (REPD), Department for Energy Security and Net Zero, Open Government Licence v3.0, plus planning designation boundaries from planning.data.gov.uk (England only). REPD is published quarterly and covers schemes of roughly 150 kW and above. Capacity is the installed capacity on record, not metered generation. Operator is the operator of record at the last extract, not confirmation of present ownership. Reference 4422.
Novarly Parcel · official public data, read properly · parcel.novarly.com
All sites · Screen your own site · Planning by council · Coal mining search by postcode