BROWNIELEYS - 3 WIND TURBINES

BROWNIELEYS - 3 WIND TURBINES is operational in Aberdeenshire with a recorded capacity of 7.5 MW, and has been generating since 2017-02-28.

7.5 MW
Capacity
as recorded in REPD
Operational
Status
since 2017-02-28
Wind Onshore
Technology
Brownieleys Renewables/Muirden Energy
Aberdeenshire
Authority
Scotland

Planning and build timeline

Application submitted2012-04-13
Permission granted2013-10-01
18 months after submission
Operational2017-02-28
41 months after consent

Aberdeenshire’s record on onshore wind

Aberdeenshire has decided 118 onshore wind schemes and approved 69%, taking a median of 12.7 months. See every onshore wind scheme decision in Aberdeenshire

Other built sites within 15 km

SiteMWDistance
Easter Tulloch Wind Farm (Tullo Extension)
Wind Onshore · Operational
251.1 km
Tullo Wind Farm North Extension (Shiels Wind Farm)
Wind Onshore · Operational
7.51.9 km
Tullo Wind Farm South (Ext.)
Wind Onshore · Operational
102.1 km
Brotherton (formerly Paul Matthew Hill wind turbines)
Wind Onshore · Operational
4.62.8 km
Macphie of Glenbervie
Biomass (dedicated) · Operational
1.28.4 km
St. Johns Hill
Wind Onshore · Operational
7.658.5 km
St John Hill
Wind Onshore · Operational
7.78.8 km
Droop Hill Wind Farm x
Wind Onshore · Operational
4.69.3 km

How big is BROWNIELEYS - 3 WIND TURBINES?

BROWNIELEYS - 3 WIND TURBINES has a recorded installed capacity of 7.5 MW. That figure is the capacity registered in REPD, which is the scheme as consented — the metered output of a site can differ.

Who operates BROWNIELEYS - 3 WIND TURBINES?

REPD records the operator as Brownieleys Renewables/Muirden Energy. Ownership of built renewable assets changes hands regularly and REPD is published quarterly, so treat this as the operator of record rather than confirmation of who owns it today.

When was BROWNIELEYS - 3 WIND TURBINES approved and built?

The application was submitted on 2012-04-13. Permission was granted on 2013-10-01, 18 months later. The site became operational on 2017-02-28, 41 months after consent.

Source: Renewable Energy Planning Database (REPD), Department for Energy Security and Net Zero, Open Government Licence v3.0, plus planning designation boundaries from planning.data.gov.uk (England only). REPD is published quarterly and covers schemes of roughly 150 kW and above. Capacity is the installed capacity on record, not metered generation. Operator is the operator of record at the last extract, not confirmation of present ownership. Reference 4348.

Novarly Parcel · official public data, read properly · parcel.novarly.com

All sites · Screen your own site · Planning by council