Macphie of Glenbervie is operational in Aberdeenshire with a recorded capacity of 1.2 MW, and has been generating since 2008-09-01.

1.2 MW
Capacity
as recorded in REPD
Operational
Status
since 2008-09-01
Biomass (dedicated)
Technology
Unknown
Aberdeenshire
Authority
Scotland

Planning and build timeline

Application submitted2007-07-13
Permission granted2007-09-27
2 months after submission
Operational2008-09-01
11 months after consent

Other built sites within 15 km

SiteMWDistance
Droop Hill Wind Farm x
Wind Onshore · Operational
4.61.2 km
Jacksbank Wind Farm (Glenbervie)
Wind Onshore · Operational
6.82.7 km
Clochnahill Wind Farm
Wind Onshore · Operational
5.26.2 km
St John Hill
Wind Onshore · Operational
7.77.4 km
St. Johns Hill
Wind Onshore · Operational
7.657.6 km
Tullo Wind Farm North Extension (Shiels Wind Farm)
Wind Onshore · Operational
7.58 km
BROWNIELEYS - 3 WIND TURBINES
Wind Onshore · Operational
7.58.4 km
Mid Hill I
Wind Onshore · Operational
57.58.5 km

How big is Macphie of Glenbervie?

Macphie of Glenbervie has a recorded installed capacity of 1.2 MW. That figure is the capacity registered in REPD, which is the scheme as consented — the metered output of a site can differ.

Who operates Macphie of Glenbervie?

REPD records the operator as Unknown. Ownership of built renewable assets changes hands regularly and REPD is published quarterly, so treat this as the operator of record rather than confirmation of who owns it today.

When was Macphie of Glenbervie approved and built?

The application was submitted on 2007-07-13. Permission was granted on 2007-09-27, 2 months later. The site became operational on 2008-09-01, 11 months after consent.

Source: Renewable Energy Planning Database (REPD), Department for Energy Security and Net Zero, Open Government Licence v3.0, plus planning designation boundaries from planning.data.gov.uk (England only). REPD is published quarterly and covers schemes of roughly 150 kW and above. Capacity is the installed capacity on record, not metered generation. Operator is the operator of record at the last extract, not confirmation of present ownership. Reference 205.