Brotherton (formerly Paul Matthew Hill wind turbines)
Brotherton (formerly Paul Matthew Hill wind turbines) is operational in Aberdeenshire with a recorded capacity of 4.6 MW, and has been generating since 2017-05-01.
Planning and build timeline
| Application submitted | 2013-04-05 |
| Permission granted | 2014-07-15 15 months after submission |
| Operational | 2017-05-01 34 months after consent |
Aberdeenshire’s record on onshore wind
Aberdeenshire has decided 118 onshore wind schemes and approved 69%, taking a median of 12.7 months. See every onshore wind scheme decision in Aberdeenshire →
Other built sites within 15 km
| Site | MW | Distance |
|---|---|---|
Tullo Wind Farm South (Ext.) Wind Onshore · Operational | 10 | 2.5 km |
Easter Tulloch Wind Farm (Tullo Extension) Wind Onshore · Operational | 25 | 2.8 km |
BROWNIELEYS - 3 WIND TURBINES Wind Onshore · Operational | 7.5 | 2.8 km |
Tullo Wind Farm North Extension (Shiels Wind Farm) Wind Onshore · Operational | 7.5 | 4 km |
St. Johns Hill Wind Onshore · Operational | 7.65 | 10.2 km |
St John Hill Wind Onshore · Operational | 7.7 | 10.7 km |
Macphie of Glenbervie Biomass (dedicated) · Operational | 1.2 | 11.2 km |
Droop Hill Wind Farm x Wind Onshore · Operational | 4.6 | 12.2 km |
How big is Brotherton (formerly Paul Matthew Hill wind turbines)?
Brotherton (formerly Paul Matthew Hill wind turbines) has a recorded installed capacity of 4.6 MW. That figure is the capacity registered in REPD, which is the scheme as consented — the metered output of a site can differ.
Who operates Brotherton (formerly Paul Matthew Hill wind turbines)?
REPD records the operator as Renewable Energy Ventures. Ownership of built renewable assets changes hands regularly and REPD is published quarterly, so treat this as the operator of record rather than confirmation of who owns it today.
When was Brotherton (formerly Paul Matthew Hill wind turbines) approved and built?
The application was submitted on 2013-04-05. Permission was granted on 2014-07-15, 15 months later. The site became operational on 2017-05-01, 34 months after consent.
Source: Renewable Energy Planning Database (REPD), Department for Energy Security and Net Zero, Open Government Licence v3.0, plus planning designation boundaries from planning.data.gov.uk (England only). REPD is published quarterly and covers schemes of roughly 150 kW and above. Capacity is the installed capacity on record, not metered generation. Operator is the operator of record at the last extract, not confirmation of present ownership. Reference 4411.