Renewable sites › Tralorg Wind Farm
Tralorg Wind Farm
Tralorg Wind Farm is an operational 20 MW onshore wind farm in South Ayrshire, generating since 1 June 2020. Planning permission was granted on 21 February 2014, 36 months after submission. Operator of record: RPMI Railpen (formerly BayWa).
Planning and build timeline
| Application submitted | 10 February 2011 |
| Permission granted | 21 February 2014 36 months after submission |
| Operational | 1 June 2020 75 months after consent |
Screening a site of your own?
South Ayrshire approves 33% of onshore wind schemes. Redline puts that number, and everything else the record holds, against your own boundary: the authority’s actual approval rate and decision times, every designation inside the red line, agricultural grade, 1 m LIDAR earthworks, how contested the grid is, and yield with a P90 — before you spend on a consultant.
Arrives prefilled with Tralorg Wind Farm’s recorded coordinate — swap in your own postcode or coordinates.
South Ayrshire’s record on onshore wind
South Ayrshire has decided 12 onshore wind schemes and approved 33%, taking a median of 24.6 months. See every onshore wind scheme decision in South Ayrshire →
Other built sites within 15 km
| Site | MW | Distance |
|---|---|---|
Wind Onshore · Operational | 25 | 3.1 km |
Wind Onshore · Operational | 120 | 4.8 km |
Wind Onshore · Operational | 18.8 | 7.6 km |
Wind Onshore · Operational | 42 | 10.1 km |
Wind Onshore · Operational | 56 | 14 km |
How big is Tralorg Wind Farm?
Tralorg Wind Farm has a recorded installed capacity of 20 MW. That figure is the capacity registered in REPD, which is the scheme as consented — the metered output of a site can differ.
Who operates Tralorg Wind Farm?
REPD records the operator as RPMI Railpen (formerly BayWa). Ownership of built renewable assets changes hands regularly and REPD is published quarterly, so treat this as the operator of record rather than confirmation of who owns it today.
When was Tralorg Wind Farm approved and built?
The application was submitted on 10 February 2011. Permission was granted on 21 February 2014, 36 months later. The site became operational on 1 June 2020, 75 months after consent.
Source: Renewable Energy Planning Database (REPD), Department for Energy Security and Net Zero, Open Government Licence v3.0, plus planning designation boundaries from planning.data.gov.uk (England only). REPD is published quarterly and covers schemes of roughly 150 kW and above. Capacity is the installed capacity on record, not metered generation. Operator is the operator of record at the last extract, not confirmation of present ownership. Reference 4073.
Novarly Parcel · official public data, read properly · parcel.novarly.com
All sites · Screen your own site · Planning by council · Coal mining search by postcode