Tralorg Wind Farm

Tralorg Wind Farm is an operational 20 MW onshore wind farm in South Ayrshire, generating since 1 June 2020. Planning permission was granted on 21 February 2014, 36 months after submission. Operator of record: RPMI Railpen (formerly BayWa).

20 MW
Capacity
as recorded in REPD
Operational
Status
since 1 June 2020
Wind Onshore
Technology
RPMI Railpen (formerly BayWa)
South Ayrshire
Authority
Scotland

Planning and build timeline

Application submitted10 February 2011
Permission granted21 February 2014
36 months after submission
Operational1 June 2020
75 months after consent

Screening a site of your own?

RedlineUK · £39

South Ayrshire approves 33% of onshore wind schemes. Redline puts that number, and everything else the record holds, against your own boundary: the authority’s actual approval rate and decision times, every designation inside the red line, agricultural grade, 1 m LIDAR earthworks, how contested the grid is, and yield with a P90 — before you spend on a consultant.

Screen a site here£39

Arrives prefilled with Tralorg Wind Farm’s recorded coordinate — swap in your own postcode or coordinates.

Consent ClockUK · Free

Granted years ago. Still not built. Every consented onshore wind scheme in the UK, computed against its statutory commencement deadline — which consents are about to lapse, and where.

Open Consent Clock →

South Ayrshire’s record on onshore wind

South Ayrshire has decided 12 onshore wind schemes and approved 33%, taking a median of 24.6 months. See every onshore wind scheme decision in South Ayrshire

Other built sites within 15 km

SiteMWDistance
Wind Onshore · Operational
253.1 km
Wind Onshore · Operational
1204.8 km
Wind Onshore · Operational
18.87.6 km
Wind Onshore · Operational
4210.1 km
Wind Onshore · Operational
5614 km

How big is Tralorg Wind Farm?

Tralorg Wind Farm has a recorded installed capacity of 20 MW. That figure is the capacity registered in REPD, which is the scheme as consented — the metered output of a site can differ.

Who operates Tralorg Wind Farm?

REPD records the operator as RPMI Railpen (formerly BayWa). Ownership of built renewable assets changes hands regularly and REPD is published quarterly, so treat this as the operator of record rather than confirmation of who owns it today.

When was Tralorg Wind Farm approved and built?

The application was submitted on 10 February 2011. Permission was granted on 21 February 2014, 36 months later. The site became operational on 1 June 2020, 75 months after consent.

Source: Renewable Energy Planning Database (REPD), Department for Energy Security and Net Zero, Open Government Licence v3.0, plus planning designation boundaries from planning.data.gov.uk (England only). REPD is published quarterly and covers schemes of roughly 150 kW and above. Capacity is the installed capacity on record, not metered generation. Operator is the operator of record at the last extract, not confirmation of present ownership. Reference 4073.

Novarly Parcel · official public data, read properly · parcel.novarly.com

All sites · Screen your own site · Planning by council · Coal mining search by postcode