Novarly ParcelRenewable sites

Renewable sitesKirk Hill Wind Farm

Kirk Hill Wind Farm

Kirk Hill Wind Farm is an operational 18.8 MW onshore wind farm in South Ayrshire, generating since 1 May 2024. Planning permission was granted on 16 February 2017, 25 months after submission. Operator of record: Corolis Energy/ ESB / Ripple Energy.

18.8 MW
Capacity
as recorded in REPD
Operational
Status
since 1 May 2024
Wind Onshore
Technology
Corolis Energy/ ESB / Ripple Energy
South Ayrshire
Authority
Scotland

Planning and build timeline

Application submitted29 January 2015
Permission granted16 February 2017
25 months after submission
Operational1 May 2024
86 months after consent

Screening a site of your own?

RedlineUK · £39

South Ayrshire approves 33% of onshore wind schemes. Redline puts that number, and everything else the record holds, against your own boundary: the authority’s actual approval rate and decision times, every designation inside the red line, agricultural grade, 1 m LIDAR earthworks, how contested the grid is, and yield with a P90 — before you spend on a consultant.

Screen a site here£39

Arrives prefilled with Kirk Hill Wind Farm’s recorded coordinate — swap in your own postcode or coordinates.

Consent ClockUK · Free

Granted years ago. Still not built. Every consented onshore wind scheme in the UK, computed against its statutory commencement deadline — which consents are about to lapse, and where.

Open Consent Clock →

South Ayrshire’s record on onshore wind

South Ayrshire has decided 12 onshore wind schemes and approved 33%, taking a median of 24.6 months. See every onshore wind scheme decision in South Ayrshire

Other built sites within 15 km

SiteMWDistance
Wind Onshore · Operational
1205.5 km
Wind Onshore · Operational
207.6 km
Wind Onshore · Operational
259.2 km

How big is Kirk Hill Wind Farm?

Kirk Hill Wind Farm has a recorded installed capacity of 18.8 MW. That figure is the capacity registered in REPD, which is the scheme as consented — the metered output of a site can differ.

Who operates Kirk Hill Wind Farm?

REPD records the operator as Corolis Energy/ ESB / Ripple Energy. Ownership of built renewable assets changes hands regularly and REPD is published quarterly, so treat this as the operator of record rather than confirmation of who owns it today.

When was Kirk Hill Wind Farm approved and built?

The application was submitted on 29 January 2015. Permission was granted on 16 February 2017, 25 months later. The site became operational on 1 May 2024, 86 months after consent.

Source: Renewable Energy Planning Database (REPD), Department for Energy Security and Net Zero, Open Government Licence v3.0, plus planning designation boundaries from planning.data.gov.uk (England only). REPD is published quarterly and covers schemes of roughly 150 kW and above. Capacity is the installed capacity on record, not metered generation. Operator is the operator of record at the last extract, not confirmation of present ownership. Reference 4988.