Dalquhandy Windfarm

Dalquhandy Windfarm is operational in South Ayrshire with a recorded capacity of 42 MW, and has been generating since 2023-01-01.

42 MW
Capacity
as recorded in REPD
Operational
Status
since 2023-01-01
Wind Onshore
Technology
Dalquhandy Wind Farm Limited
South Ayrshire
Authority
Scotland

Planning and build timeline

Application submitted2012-02-01
Permission granted2015-01-27
36 months after submission
Operational2023-01-01
95 months after consent

South Ayrshire’s record on onshore wind

South Ayrshire has decided 12 onshore wind schemes and approved 33%, taking a median of 24.6 months. See every onshore wind scheme decision in South Ayrshire

Other built sites within 15 km

SiteMWDistance
Assel Valley Wind Farm
Wind Onshore · Operational
259.8 km
Tralorg Wind Farm
Wind Onshore · Operational
2010.1 km
Mark Hill
Wind Onshore · Operational
5611.9 km
Hadyard Hill
Wind Onshore · Operational
12014.1 km
Arecleoch Windfarm
Wind Onshore · Operational
12014.4 km
Arecleoch Wind Farm (extension)
Wind Onshore · Under Construction
72.814.4 km
Arecleoch Wind Farm (extension)
Battery · Under Construction
2014.4 km

How big is Dalquhandy Windfarm?

Dalquhandy Windfarm has a recorded installed capacity of 42 MW. That figure is the capacity registered in REPD, which is the scheme as consented — the metered output of a site can differ.

Who operates Dalquhandy Windfarm?

REPD records the operator as Dalquhandy Wind Farm Limited. Ownership of built renewable assets changes hands regularly and REPD is published quarterly, so treat this as the operator of record rather than confirmation of who owns it today.

When was Dalquhandy Windfarm approved and built?

The application was submitted on 2012-02-01. Permission was granted on 2015-01-27, 36 months later. The site became operational on 2023-01-01, 95 months after consent.

Source: Renewable Energy Planning Database (REPD), Department for Energy Security and Net Zero, Open Government Licence v3.0, plus planning designation boundaries from planning.data.gov.uk (England only). REPD is published quarterly and covers schemes of roughly 150 kW and above. Capacity is the installed capacity on record, not metered generation. Operator is the operator of record at the last extract, not confirmation of present ownership. Reference 4189.

Novarly Parcel · official public data, read properly · parcel.novarly.com

All sites · Screen your own site · Planning by council