Renewable sites › Tesco Queensway Place
Tesco Queensway Place
Tesco Queensway Place is operational in Somerset with a recorded capacity of 0.3 MW, and has been generating since 2019-12-20.
Planning and build timeline
| Application submitted | 2019-01-03 |
| Permission granted | not recorded |
| Operational | 2019-12-20 |
What this site sits on
The recorded coordinate falls on land surveyed as Urban agricultural land.
- Nutrient-neutrality catchment — Parrett Catchment
REPD gives one representative coordinate per scheme, not the site boundary, so this describes the point on record rather than the whole site — a large site can straddle a designation edge. Boundaries come from planning.data.gov.uk, which publishes for England only.
Somerset’s record on solar
Somerset has decided 147 solar farms and approved 86%, taking a median of 3 months. See every solar farm decision in Somerset →
Other built sites within 15 km
| Site | MW | Distance |
|---|---|---|
Westland Leisure Complex Solar Photovoltaics · Operational | 0.22 | 0.8 km |
Clifton Farm Solar Photovoltaics · Operational | 35 | 4.7 km |
Chilton Cantelo Solar Farm Solar Photovoltaics · Operational | 5 | 6.3 km |
Caswell Farm Solar Park Solar Photovoltaics · Operational | 6.7 | 6.7 km |
Southfield Farm Solar Park Solar Photovoltaics · Operational | 11.5 | 8.2 km |
Bearley Lane Anaerobic Digestion · Operational | 1.3 | 8.3 km |
Sutton Montis Road Solar Park / Sutton Bridge Solar Farm Solar Photovoltaics · Operational | 5.4 | 9.4 km |
Lower Severalls Farm Solar Photovoltaics · Operational | 10.8 | 11 km |
How big is Tesco Queensway Place?
Tesco Queensway Place has a recorded installed capacity of 0.3 MW. That figure is the capacity registered in REPD, which is the scheme as consented — the metered output of a site can differ.
Who operates Tesco Queensway Place?
REPD records the operator as Push Energy. Ownership of built renewable assets changes hands regularly and REPD is published quarterly, so treat this as the operator of record rather than confirmation of who owns it today.
When was Tesco Queensway Place approved and built?
The application was submitted on 2019-01-03. REPD does not record a grant date. The site became operational on 2019-12-20.
Source: Renewable Energy Planning Database (REPD), Department for Energy Security and Net Zero, Open Government Licence v3.0, plus planning designation boundaries from planning.data.gov.uk (England only). REPD is published quarterly and covers schemes of roughly 150 kW and above. Capacity is the installed capacity on record, not metered generation. Operator is the operator of record at the last extract, not confirmation of present ownership. Reference 7321.