Novarly ParcelRenewable sites

Renewable sitesSutton Montis Road Solar Park / Sutton Bridge Solar Farm

Sutton Montis Road Solar Park / Sutton Bridge Solar Farm

Sutton Montis Road Solar Park / Sutton Bridge Solar Farm is operational in Somerset with a recorded capacity of 5.4 MW, and has been generating since 2015-02-10.

5.4 MW
Capacity
as recorded in REPD
Operational
Status
since 2015-02-10
Solar Photovoltaics
Technology
PS Renewables
Somerset
Authority
England

Planning and build timeline

Application submitted2013-04-29
Permission granted2014-01-28
9 months after submission
Operational2015-02-10
12 months after consent

What this site sits on

The recorded coordinate falls on land surveyed as Grade 3 agricultural land. The published survey does not split Grade 3 into 3a and 3b, so this alone does not settle whether the land counts as best and most versatile.

REPD gives one representative coordinate per scheme, not the site boundary, so this describes the point on record rather than the whole site — a large site can straddle a designation edge. Boundaries come from planning.data.gov.uk, which publishes for England only.

Somerset’s record on solar

Somerset has decided 147 solar farms and approved 86%, taking a median of 3 months. See every solar farm decision in Somerset

Other built sites within 15 km

SiteMWDistance
Southfield Farm Solar Park
Solar Photovoltaics · Operational
11.53.1 km
Chilton Cantelo Solar Farm
Solar Photovoltaics · Operational
53.4 km
Dimmer Landfill Site
Landfill Gas · Operational
1.96.9 km
Dimmer Landfill Gas Scheme
Landfill Gas · Operational
2.37 km
Dimmer Anaerobic Digestor (Waste AD)
Anaerobic Digestion · Operational
37.5 km
Tout Lane, Charlton Adam - Solar Photovoltaic System
Solar Photovoltaics · Operational
0.38 km
Manor Farm (Keinton Mandeville)
Solar Photovoltaics · Operational
18.2 km
Manor Farm (Castle Cary)
Solar Photovoltaics · Operational
1.88.4 km

How big is Sutton Montis Road Solar Park / Sutton Bridge Solar Farm?

Sutton Montis Road Solar Park / Sutton Bridge Solar Farm has a recorded installed capacity of 5.4 MW. That figure is the capacity registered in REPD, which is the scheme as consented — the metered output of a site can differ.

Who operates Sutton Montis Road Solar Park / Sutton Bridge Solar Farm?

REPD records the operator as PS Renewables. Ownership of built renewable assets changes hands regularly and REPD is published quarterly, so treat this as the operator of record rather than confirmation of who owns it today.

When was Sutton Montis Road Solar Park / Sutton Bridge Solar Farm approved and built?

The application was submitted on 2013-04-29. Permission was granted on 2014-01-28, 9 months later. The site became operational on 2015-02-10, 12 months after consent.

Source: Renewable Energy Planning Database (REPD), Department for Energy Security and Net Zero, Open Government Licence v3.0, plus planning designation boundaries from planning.data.gov.uk (England only). REPD is published quarterly and covers schemes of roughly 150 kW and above. Capacity is the installed capacity on record, not metered generation. Operator is the operator of record at the last extract, not confirmation of present ownership. Reference 2067.

Novarly Parcel · official public data, read properly · parcel.novarly.com

All sites · Screen your own site · Planning by council