Dimmer Landfill Site
Dimmer Landfill Site is operational in Somerset with a recorded capacity of 1.9 MW, and has been generating since 2000-12-15.
Planning and build timeline
| Application submitted | 1998-07-01 |
| Permission granted | 1998-09-03 2 months after submission |
| Operational | 2000-12-15 27 months after consent |
What this site sits on
The recorded coordinate falls on land surveyed as Grade 3 agricultural land. The published survey does not split Grade 3 into 3a and 3b, so this alone does not settle whether the land counts as best and most versatile.
- Nutrient-neutrality catchment — Parrett Catchment
REPD gives one representative coordinate per scheme, not the site boundary, so this describes the point on record rather than the whole site — a large site can straddle a designation edge. Boundaries come from planning.data.gov.uk, which publishes for England only.
Other built sites within 15 km
| Site | MW | Distance |
|---|---|---|
Dimmer Landfill Gas Scheme Landfill Gas · Operational | 2.3 | 0.1 km |
Dimmer Anaerobic Digestor (Waste AD) Anaerobic Digestion · Operational | 3 | 0.6 km |
Manor Farm (Castle Cary) Solar Photovoltaics · Operational | 1.8 | 3.1 km |
Manor Farm (Keinton Mandeville) Solar Photovoltaics · Operational | 1 | 6.1 km |
Wyke Farms Biogas (Farm AD) Anaerobic Digestion · Operational | 1 | 6.5 km |
Sutton Montis Road Solar Park / Sutton Bridge Solar Farm Solar Photovoltaics · Operational | 5.4 | 6.9 km |
Southfield Farm Solar Park Solar Photovoltaics · Operational | 11.5 | 7.8 km |
Pylle Southern solar park (Lower Easton Farm) Solar Photovoltaics · Operational | 5 | 8 km |
How big is Dimmer Landfill Site?
Dimmer Landfill Site has a recorded installed capacity of 1.9 MW. That figure is the capacity registered in REPD, which is the scheme as consented — the metered output of a site can differ.
Who operates Dimmer Landfill Site?
REPD records the operator as Gengas Ltd. Ownership of built renewable assets changes hands regularly and REPD is published quarterly, so treat this as the operator of record rather than confirmation of who owns it today.
When was Dimmer Landfill Site approved and built?
The application was submitted on 1998-07-01. Permission was granted on 1998-09-03, 2 months later. The site became operational on 2000-12-15, 27 months after consent.
Source: Renewable Energy Planning Database (REPD), Department for Energy Security and Net Zero, Open Government Licence v3.0, plus planning designation boundaries from planning.data.gov.uk (England only). REPD is published quarterly and covers schemes of roughly 150 kW and above. Capacity is the installed capacity on record, not metered generation. Operator is the operator of record at the last extract, not confirmation of present ownership. Reference 593.