Dimmer Landfill Site

Dimmer Landfill Site is operational in Somerset with a recorded capacity of 1.9 MW, and has been generating since 2000-12-15.

1.9 MW
Capacity
as recorded in REPD
Operational
Status
since 2000-12-15
Landfill Gas
Technology
Gengas Ltd
Somerset
Authority
England

Planning and build timeline

Application submitted1998-07-01
Permission granted1998-09-03
2 months after submission
Operational2000-12-15
27 months after consent

What this site sits on

The recorded coordinate falls on land surveyed as Grade 3 agricultural land. The published survey does not split Grade 3 into 3a and 3b, so this alone does not settle whether the land counts as best and most versatile.

REPD gives one representative coordinate per scheme, not the site boundary, so this describes the point on record rather than the whole site — a large site can straddle a designation edge. Boundaries come from planning.data.gov.uk, which publishes for England only.

Other built sites within 15 km

SiteMWDistance
Dimmer Landfill Gas Scheme
Landfill Gas · Operational
2.30.1 km
Dimmer Anaerobic Digestor (Waste AD)
Anaerobic Digestion · Operational
30.6 km
Manor Farm (Castle Cary)
Solar Photovoltaics · Operational
1.83.1 km
Manor Farm (Keinton Mandeville)
Solar Photovoltaics · Operational
16.1 km
Wyke Farms Biogas (Farm AD)
Anaerobic Digestion · Operational
16.5 km
Sutton Montis Road Solar Park / Sutton Bridge Solar Farm
Solar Photovoltaics · Operational
5.46.9 km
Southfield Farm Solar Park
Solar Photovoltaics · Operational
11.57.8 km
Pylle Southern solar park (Lower Easton Farm)
Solar Photovoltaics · Operational
58 km

How big is Dimmer Landfill Site?

Dimmer Landfill Site has a recorded installed capacity of 1.9 MW. That figure is the capacity registered in REPD, which is the scheme as consented — the metered output of a site can differ.

Who operates Dimmer Landfill Site?

REPD records the operator as Gengas Ltd. Ownership of built renewable assets changes hands regularly and REPD is published quarterly, so treat this as the operator of record rather than confirmation of who owns it today.

When was Dimmer Landfill Site approved and built?

The application was submitted on 1998-07-01. Permission was granted on 1998-09-03, 2 months later. The site became operational on 2000-12-15, 27 months after consent.

Source: Renewable Energy Planning Database (REPD), Department for Energy Security and Net Zero, Open Government Licence v3.0, plus planning designation boundaries from planning.data.gov.uk (England only). REPD is published quarterly and covers schemes of roughly 150 kW and above. Capacity is the installed capacity on record, not metered generation. Operator is the operator of record at the last extract, not confirmation of present ownership. Reference 593.

Novarly Parcel · official public data, read properly · parcel.novarly.com

All sites · Screen your own site · Planning by council