Novarly ParcelRenewable sites

Renewable sitesManor Farm (Keinton Mandeville)

Manor Farm (Keinton Mandeville)

Manor Farm (Keinton Mandeville) is operational in Somerset with a recorded capacity of 1 MW, and has been generating since 2011-07-15.

1 MW
Capacity
as recorded in REPD
Operational
Status
since 2011-07-15
Solar Photovoltaics
Technology
Private Developer
Somerset
Authority
England

Planning and build timeline

Application submitted2011-03-29
Permission granted2011-05-23
2 months after submission
Operational2011-07-15
2 months after consent

What this site sits on

The recorded coordinate falls on land surveyed as Grade 3 agricultural land. The published survey does not split Grade 3 into 3a and 3b, so this alone does not settle whether the land counts as best and most versatile.

REPD gives one representative coordinate per scheme, not the site boundary, so this describes the point on record rather than the whole site — a large site can straddle a designation edge. Boundaries come from planning.data.gov.uk, which publishes for England only.

Somerset’s record on solar

Somerset has decided 147 solar farms and approved 86%, taking a median of 3 months. See every solar farm decision in Somerset

Other built sites within 15 km

SiteMWDistance
Tout Lane, Charlton Adam - Solar Photovoltaic System
Solar Photovoltaics · Operational
0.32.7 km
Higher Hill Farm
Solar Photovoltaics · Operational
53.5 km
Higher Hill Farm Energy Storage
Battery · Operational
0.34 km
Higher Hill Farm (extension)
Solar Photovoltaics · Operational
1.54 km
PARK WOOD SOLAR FARM
Solar Photovoltaics · Operational
54.5 km
Dimmer Anaerobic Digestor (Waste AD)
Anaerobic Digestion · Operational
36.1 km
Dimmer Landfill Site
Landfill Gas · Operational
1.96.1 km
Dimmer Landfill Gas Scheme
Landfill Gas · Operational
2.36.2 km

How big is Manor Farm (Keinton Mandeville)?

Manor Farm (Keinton Mandeville) has a recorded installed capacity of 1 MW. That figure is the capacity registered in REPD, which is the scheme as consented — the metered output of a site can differ.

Who operates Manor Farm (Keinton Mandeville)?

REPD records the operator as Private Developer. Ownership of built renewable assets changes hands regularly and REPD is published quarterly, so treat this as the operator of record rather than confirmation of who owns it today.

When was Manor Farm (Keinton Mandeville) approved and built?

The application was submitted on 2011-03-29. Permission was granted on 2011-05-23, 2 months later. The site became operational on 2011-07-15, 2 months after consent.

Source: Renewable Energy Planning Database (REPD), Department for Energy Security and Net Zero, Open Government Licence v3.0, plus planning designation boundaries from planning.data.gov.uk (England only). REPD is published quarterly and covers schemes of roughly 150 kW and above. Capacity is the installed capacity on record, not metered generation. Operator is the operator of record at the last extract, not confirmation of present ownership. Reference 2387.

Novarly Parcel · official public data, read properly · parcel.novarly.com

All sites · Screen your own site · Planning by council