Mingay Farm
Mingay Farm is operational in East Cambridgeshire with a recorded capacity of 5 MW, and has been generating since 2011-07-14.
Planning and build timeline
| Application submitted | 2010-10-22 |
| Permission granted | 2011-02-09 4 months after submission |
| Operational | 2011-07-14 5 months after consent |
What this site sits on
The recorded coordinate falls on land surveyed as Grade 3 agricultural land. The published survey does not split Grade 3 into 3a and 3b, so this alone does not settle whether the land counts as best and most versatile.
REPD gives one representative coordinate per scheme, not the site boundary, so this describes the point on record rather than the whole site — a large site can straddle a designation edge. Boundaries come from planning.data.gov.uk, which publishes for England only.
East Cambridgeshire’s record on solar
East Cambridgeshire has decided 21 solar farms and approved 100%, taking a median of 3.4 months. See every solar farm decision in East Cambridgeshire →
Other built sites within 15 km
| Site | MW | Distance |
|---|---|---|
Mingay Farm - extension Solar Photovoltaics · Operational | 19.3 | 1.3 km |
Stowbridge Farm Solar Photovoltaics · Operational | 24 | 4 km |
Stowbridge Farm - Extension (Phase 2) Solar Photovoltaics · Operational | 10 | 4.2 km |
Stowbridge Farm - Extension (Phase 1) Solar Photovoltaics · Operational | 10 | 4.3 km |
Chittering Solar Farm Solar Photovoltaics · Operational | 5 | 4.8 km |
Chittering Solar Farm Extension Solar Photovoltaics · Operational | 6.3 | 4.8 km |
Ely Road Waste Management Park Solar Photovoltaics · Operational | 1.1 | 5.3 km |
Elean Business Park Biomass Plant Biomass (dedicated) · Operational | 40 | 6.4 km |
How big is Mingay Farm?
Mingay Farm has a recorded installed capacity of 5 MW. That figure is the capacity registered in REPD, which is the scheme as consented — the metered output of a site can differ.
Who operates Mingay Farm?
REPD records the operator as Abbey Renewables. Ownership of built renewable assets changes hands regularly and REPD is published quarterly, so treat this as the operator of record rather than confirmation of who owns it today.
When was Mingay Farm approved and built?
The application was submitted on 2010-10-22. Permission was granted on 2011-02-09, 4 months later. The site became operational on 2011-07-14, 5 months after consent.
Source: Renewable Energy Planning Database (REPD), Department for Energy Security and Net Zero, Open Government Licence v3.0, plus planning designation boundaries from planning.data.gov.uk (England only). REPD is published quarterly and covers schemes of roughly 150 kW and above. Capacity is the installed capacity on record, not metered generation. Operator is the operator of record at the last extract, not confirmation of present ownership. Reference 1387.