Renewable sites › Stoke-on-Trent EfW
Stoke-on-Trent EfW
Stoke-on-Trent EfW is operational in Stoke-on-Trent with a recorded capacity of 14.2 MW, and has been generating since 1998-01-10.
Planning and build timeline
| Application submitted | 1994-12-06 |
| Permission granted | 1995-04-11 4 months after submission |
| Operational | 1998-01-10 33 months after consent |
What this site sits on
The recorded coordinate falls on land surveyed as Grade 3 agricultural land. The published survey does not split Grade 3 into 3a and 3b, so this alone does not settle whether the land counts as best and most versatile.
REPD gives one representative coordinate per scheme, not the site boundary, so this describes the point on record rather than the whole site — a large site can straddle a designation edge. Boundaries come from planning.data.gov.uk, which publishes for England only.
Other built sites within 15 km
| Site | MW | Distance |
|---|---|---|
Screwfix Direct Solar Photovoltaics · Operational | 2.5 | 1.7 km |
Keele University Battery · Operational | — | 5.1 km |
Keele University Solar Photovoltaics · Operational | 4.4 | 5.1 km |
The Low Carbon Energy Generation Project at Keele University Wind Onshore · Operational | 1.9 | 6.1 km |
Noriker Power Staunch Battery · Operational | 20 | 6.4 km |
Land at Heywood Grange Solar Photovoltaics · Operational | 8.4 | 8.3 km |
Meece Landfill Landfill Gas · Operational | 1.3 | 9.9 km |
Lower Newton Farm Solar Photovoltaics · Operational | 11.5 | 11.9 km |
How big is Stoke-on-Trent EfW?
Stoke-on-Trent EfW has a recorded installed capacity of 14.2 MW. That figure is the capacity registered in REPD, which is the scheme as consented — the metered output of a site can differ.
Who operates Stoke-on-Trent EfW?
REPD records the operator as MES Environmental (CNIM Group). Ownership of built renewable assets changes hands regularly and REPD is published quarterly, so treat this as the operator of record rather than confirmation of who owns it today.
When was Stoke-on-Trent EfW approved and built?
The application was submitted on 1994-12-06. Permission was granted on 1995-04-11, 4 months later. The site became operational on 1998-01-10, 33 months after consent.
Source: Renewable Energy Planning Database (REPD), Department for Energy Security and Net Zero, Open Government Licence v3.0, plus planning designation boundaries from planning.data.gov.uk (England only). REPD is published quarterly and covers schemes of roughly 150 kW and above. Capacity is the installed capacity on record, not metered generation. Operator is the operator of record at the last extract, not confirmation of present ownership. Reference 815.
Novarly Parcel · official public data, read properly · parcel.novarly.com