Planning and build timeline
| Application submitted | 24 March 2016 |
| Permission granted | 19 May 2016 2 months after submission |
| Operational | 15 March 2017 10 months after consent |
Screening a site of your own?
Redline runs the record on your own boundary in Newcastle-under-Lyme: the authority’s actual approval rate and decision times, every designation inside the red line, agricultural grade, 1 m LIDAR earthworks, how contested the grid is, and yield with a P90 — before you spend on a consultant.
Arrives prefilled with Noriker Power Staunch’s recorded coordinate — swap in your own postcode or coordinates.
What this site sits on
The recorded coordinate falls on land surveyed as Urban agricultural land.
REPD gives one representative coordinate per scheme, not the site boundary, so this describes the point on record rather than the whole site — a large site can straddle a designation edge. Boundaries come from planning.data.gov.uk, which publishes for England only.
Other built sites within 15 km
| Site | MW | Distance |
|---|---|---|
Wind Onshore · Operational | 1.9 | 3.9 km |
Solar Photovoltaics · Operational | 4.4 | 4.2 km |
Battery · Operational | — | 4.2 km |
EfW Incineration · Operational | 14.2 | 6.4 km |
Solar Photovoltaics · Operational | 2.5 | 8 km |
Solar Photovoltaics · Operational | 8.4 | 12.9 km |
Landfill Gas · Operational | 1.3 | 14.6 km |
How big is Noriker Power Staunch?
Noriker Power Staunch has a recorded installed capacity of 20 MW. That figure is the capacity registered in REPD, which is the scheme as consented — the metered output of a site can differ.
Who operates Noriker Power Staunch?
REPD records the operator as Hazel Capital/ Noriker Power. Ownership of built renewable assets changes hands regularly and REPD is published quarterly, so treat this as the operator of record rather than confirmation of who owns it today.
When was Noriker Power Staunch approved and built?
The application was submitted on 24 March 2016. Permission was granted on 19 May 2016, 2 months later. The site became operational on 15 March 2017, 10 months after consent.
Source: Renewable Energy Planning Database (REPD), Department for Energy Security and Net Zero, Open Government Licence v3.0, plus planning designation boundaries from planning.data.gov.uk (England only). REPD is published quarterly and covers schemes of roughly 150 kW and above. Capacity is the installed capacity on record, not metered generation. Operator is the operator of record at the last extract, not confirmation of present ownership. Reference 6918.
Novarly Parcel · official public data, read properly · parcel.novarly.com
All sites · Screen your own site · Planning by council · Coal mining search by postcode