Renewable sites › Lower Newton Farm
Lower Newton Farm
Lower Newton Farm is operational in Staffordshire Moorlands with a recorded capacity of 11.5 MW, and has been generating since 2015-03-31.
Planning and build timeline
| Application submitted | 2014-04-25 |
| Permission granted | 2014-08-26 4 months after submission |
| Operational | 2015-03-31 7 months after consent |
What this site sits on
The recorded coordinate falls on land surveyed as Grade 3 agricultural land. The published survey does not split Grade 3 into 3a and 3b, so this alone does not settle whether the land counts as best and most versatile.
REPD gives one representative coordinate per scheme, not the site boundary, so this describes the point on record rather than the whole site — a large site can straddle a designation edge. Boundaries come from planning.data.gov.uk, which publishes for England only.
Staffordshire Moorlands’s record on solar
Staffordshire Moorlands has decided 12 solar farms and approved 92%, taking a median of 5.9 months. See every solar farm decision in Staffordshire Moorlands →
Other built sites within 15 km
| Site | MW | Distance |
|---|---|---|
Land at Heywood Grange Solar Photovoltaics · Operational | 8.4 | 6.1 km |
Moneystone Quarry Solar Farm Solar Photovoltaics · Operational | 5 | 9.4 km |
Woodhouse Fields Farm Solar Photovoltaics · Operational | 5 | 10.1 km |
Screwfix Direct Solar Photovoltaics · Operational | 2.5 | 10.6 km |
Stoke-on-Trent EfW EfW Incineration · Operational | 14.2 | 11.9 km |
Solar farm at land at The Willows, Uttoxeter Solar Photovoltaics · Operational | 6.4 | 13.4 km |
Meece Landfill Landfill Gas · Operational | 1.3 | 14.2 km |
Marchington Solar Farm Solar Photovoltaics · Operational | 4.3 | 14.8 km |
How big is Lower Newton Farm?
Lower Newton Farm has a recorded installed capacity of 11.5 MW. That figure is the capacity registered in REPD, which is the scheme as consented — the metered output of a site can differ.
Who operates Lower Newton Farm?
REPD records the operator as Novus Solar Developments. Ownership of built renewable assets changes hands regularly and REPD is published quarterly, so treat this as the operator of record rather than confirmation of who owns it today.
When was Lower Newton Farm approved and built?
The application was submitted on 2014-04-25. Permission was granted on 2014-08-26, 4 months later. The site became operational on 2015-03-31, 7 months after consent.
Source: Renewable Energy Planning Database (REPD), Department for Energy Security and Net Zero, Open Government Licence v3.0, plus planning designation boundaries from planning.data.gov.uk (England only). REPD is published quarterly and covers schemes of roughly 150 kW and above. Capacity is the installed capacity on record, not metered generation. Operator is the operator of record at the last extract, not confirmation of present ownership. Reference 2032.