Southill Solar

Southill Solar is an operational 4.5 MW solar farm in West Oxfordshire, generating since 14 November 2016. Planning permission was granted on 7 September 2015, 4 months after submission. Operator of record: Sustainable Charlbury (Community).

4.5 MW
Capacity
as recorded in REPD
Operational
Status
since 14 November 2016
Solar Photovoltaics
Technology
Sustainable Charlbury (Community)
West Oxfordshire
Authority
England

Planning and build timeline

Application submitted28 April 2015
Permission granted7 September 2015
4 months after submission
Operational14 November 2016
14 months after consent

Screening a site of your own?

RedlineUK · £39

West Oxfordshire approves 81% of solar farms. Redline puts that number, and everything else the record holds, against your own boundary: the authority’s actual approval rate and decision times, every designation inside the red line, agricultural grade, 1 m LIDAR earthworks, how contested the grid is, and yield with a P90 — before you spend on a consultant.

Screen a site here£39

Arrives prefilled with Southill Solar’s recorded coordinate — swap in your own postcode or coordinates.

Consent ClockUK · Free

Granted years ago. Still not built. Every consented solar farm in the UK, computed against its statutory commencement deadline — which consents are about to lapse, and where.

Open Consent Clock →

What this site sits on

The recorded coordinate falls on land surveyed as Grade 3 agricultural land. The published survey does not split Grade 3 into 3a and 3b, so this alone does not settle whether the land counts as best and most versatile.

REPD gives one representative coordinate per scheme, not the site boundary, so this describes the point on record rather than the whole site — a large site can straddle a designation edge. Boundaries come from planning.data.gov.uk, which publishes for England only.

West Oxfordshire’s record on solar

West Oxfordshire has decided 21 solar farms and approved 81%, taking a median of 3.2 months. See every solar farm decision in West Oxfordshire

Other built sites within 15 km

SiteMWDistance
Solar Photovoltaics · Operational
13.27.9 km
Solar Photovoltaics · Under Construction
58.1 km
Battery · Under Construction
1810 km
Solar Photovoltaics · Under Construction
3210 km
Solar Photovoltaics · Under Construction
3610.7 km
Anaerobic Digestion · Operational
2.112 km
Solar Photovoltaics · Operational
12.512.3 km
Solar Photovoltaics · Operational
10.513.9 km

How big is Southill Solar?

Southill Solar has a recorded installed capacity of 4.5 MW. That figure is the capacity registered in REPD, which is the scheme as consented — the metered output of a site can differ.

Who operates Southill Solar?

REPD records the operator as Sustainable Charlbury (Community). Ownership of built renewable assets changes hands regularly and REPD is published quarterly, so treat this as the operator of record rather than confirmation of who owns it today.

When was Southill Solar approved and built?

The application was submitted on 28 April 2015. Permission was granted on 7 September 2015, 4 months later. The site became operational on 14 November 2016, 14 months after consent.

Source: Renewable Energy Planning Database (REPD), Department for Energy Security and Net Zero, Open Government Licence v3.0, plus planning designation boundaries from planning.data.gov.uk (England only). REPD is published quarterly and covers schemes of roughly 150 kW and above. Capacity is the installed capacity on record, not metered generation. Operator is the operator of record at the last extract, not confirmation of present ownership. Reference 5835.

Novarly Parcel · official public data, read properly · parcel.novarly.com

All sites · Screen your own site · Planning by council · Coal mining search by postcode