Renewable sites › Aurora Solar Farm
Aurora Solar Farm
Aurora Solar Farm is under construction in West Oxfordshire with a recorded capacity of 32 MW.
Planning and build timeline
| Application submitted | 2019-09-24 |
| Permission granted | 2020-02-10 5 months after submission |
| Operational | not recorded |
What this site sits on
The recorded coordinate falls on land surveyed as Grade 3 agricultural land. The published survey does not split Grade 3 into 3a and 3b, so this alone does not settle whether the land counts as best and most versatile.
REPD gives one representative coordinate per scheme, not the site boundary, so this describes the point on record rather than the whole site — a large site can straddle a designation edge. Boundaries come from planning.data.gov.uk, which publishes for England only.
West Oxfordshire’s record on solar
West Oxfordshire has decided 21 solar farms and approved 81%, taking a median of 3.2 months. See every solar farm decision in West Oxfordshire →
Other built sites within 15 km
| Site | MW | Distance |
|---|---|---|
Aurora Solar Farm Battery · Under Construction | 18 | 0 km |
Eynsham Solar Farm Solar Photovoltaics · Operational | 13.2 | 2.1 km |
Cassington AD (Waste AD) Anaerobic Digestion · Operational | 2.1 | 5.5 km |
Ducklington Solar Farm Solar Photovoltaics · Under Construction | 36 | 7.2 km |
The Flit Solar Photovoltaics · Operational | 10.5 | 8 km |
Blenheim Net Zero Estate Solar Photovoltaics · Under Construction | 5 | 8 km |
Southill Solar Solar Photovoltaics · Operational | 4.5 | 10 km |
Westerfield Farm Solar Photovoltaics · Operational | 12.5 | 14.1 km |
How big is Aurora Solar Farm?
Aurora Solar Farm has a recorded installed capacity of 32 MW. That figure is the capacity registered in REPD, which is the scheme as consented — the metered output of a site can differ.
Who operates Aurora Solar Farm?
REPD records the operator as Low Carbon UK Solar Investment Company. Ownership of built renewable assets changes hands regularly and REPD is published quarterly, so treat this as the operator of record rather than confirmation of who owns it today.
When was Aurora Solar Farm approved and built?
The application was submitted on 2019-09-24. Permission was granted on 2020-02-10, 5 months later. The site is recorded as under construction and has no operational date yet.
Source: Renewable Energy Planning Database (REPD), Department for Energy Security and Net Zero, Open Government Licence v3.0, plus planning designation boundaries from planning.data.gov.uk (England only). REPD is published quarterly and covers schemes of roughly 150 kW and above. Capacity is the installed capacity on record, not metered generation. Operator is the operator of record at the last extract, not confirmation of present ownership. Reference 7384.
Novarly Parcel · official public data, read properly · parcel.novarly.com