Planning and build timeline

Application submitted2019-09-24
Permission granted2020-02-10
5 months after submission
Operationalnot recorded

What this site sits on

The recorded coordinate falls on land surveyed as Grade 3 agricultural land. The published survey does not split Grade 3 into 3a and 3b, so this alone does not settle whether the land counts as best and most versatile.

REPD gives one representative coordinate per scheme, not the site boundary, so this describes the point on record rather than the whole site — a large site can straddle a designation edge. Boundaries come from planning.data.gov.uk, which publishes for England only.

West Oxfordshire’s record on solar

West Oxfordshire has decided 21 solar farms and approved 81%, taking a median of 3.2 months. See every solar farm decision in West Oxfordshire

Other built sites within 15 km

SiteMWDistance
Aurora Solar Farm
Battery · Under Construction
180 km
Eynsham Solar Farm
Solar Photovoltaics · Operational
13.22.1 km
Cassington AD (Waste AD)
Anaerobic Digestion · Operational
2.15.5 km
Ducklington Solar Farm
Solar Photovoltaics · Under Construction
367.2 km
The Flit
Solar Photovoltaics · Operational
10.58 km
Blenheim Net Zero Estate
Solar Photovoltaics · Under Construction
58 km
Southill Solar
Solar Photovoltaics · Operational
4.510 km
Westerfield Farm
Solar Photovoltaics · Operational
12.514.1 km

How big is Aurora Solar Farm?

Aurora Solar Farm has a recorded installed capacity of 32 MW. That figure is the capacity registered in REPD, which is the scheme as consented — the metered output of a site can differ.

Who operates Aurora Solar Farm?

REPD records the operator as Low Carbon UK Solar Investment Company. Ownership of built renewable assets changes hands regularly and REPD is published quarterly, so treat this as the operator of record rather than confirmation of who owns it today.

When was Aurora Solar Farm approved and built?

The application was submitted on 2019-09-24. Permission was granted on 2020-02-10, 5 months later. The site is recorded as under construction and has no operational date yet.

Source: Renewable Energy Planning Database (REPD), Department for Energy Security and Net Zero, Open Government Licence v3.0, plus planning designation boundaries from planning.data.gov.uk (England only). REPD is published quarterly and covers schemes of roughly 150 kW and above. Capacity is the installed capacity on record, not metered generation. Operator is the operator of record at the last extract, not confirmation of present ownership. Reference 7384.

Novarly Parcel · official public data, read properly · parcel.novarly.com

All sites · Screen your own site · Planning by council