Novarly ParcelRenewable sites

Renewable sitesAurora Solar Farm

Aurora Solar Farm

Aurora Solar Farm is an 18 MW battery storage site under construction in West Oxfordshire. Planning permission was granted on 22 April 2021, 19 months after submission. Operator of record: Low Carbon UK Solar Investment Company.

18 MW
Capacity
as recorded in REPD
Under Construction
Status
no operational date
Battery
Technology
Low Carbon UK Solar Investment Company
West Oxfordshire
Authority
England

Planning and build timeline

Application submitted24 September 2019
Permission granted22 April 2021
19 months after submission
Operationalnot recorded

Screening a site of your own?

RedlineUK · £39

West Oxfordshire approves 86% of battery storage schemes. Redline puts that number, and everything else the record holds, against your own boundary: the authority’s actual approval rate and decision times, every designation inside the red line, agricultural grade, 1 m LIDAR earthworks, how contested the grid is, and yield with a P90 — before you spend on a consultant.

Screen a site here£39

Arrives prefilled with Aurora Solar Farm’s recorded coordinate — swap in your own postcode or coordinates.

Consent ClockUK · Free

Granted years ago. Still not built. Every consented battery storage scheme in the UK, computed against its statutory commencement deadline — which consents are about to lapse, and where.

Open Consent Clock →

What this site sits on

The recorded coordinate falls on land surveyed as Grade 3 agricultural land. The published survey does not split Grade 3 into 3a and 3b, so this alone does not settle whether the land counts as best and most versatile.

REPD gives one representative coordinate per scheme, not the site boundary, so this describes the point on record rather than the whole site — a large site can straddle a designation edge. Boundaries come from planning.data.gov.uk, which publishes for England only.

West Oxfordshire’s record on battery storage

West Oxfordshire has decided 7 battery storage schemes and approved 86%, taking a median of 6.7 months. See every battery storage scheme decision in West Oxfordshire

Other built sites within 15 km

SiteMWDistance
Solar Photovoltaics · Under Construction
320 km
Solar Photovoltaics · Operational
13.22.1 km
Anaerobic Digestion · Operational
2.15.5 km
Solar Photovoltaics · Under Construction
367.2 km
Solar Photovoltaics · Operational
10.58 km
Solar Photovoltaics · Under Construction
58 km
Solar Photovoltaics · Operational
4.510 km
Solar Photovoltaics · Operational
12.514.1 km

How big is Aurora Solar Farm?

Aurora Solar Farm has a recorded installed capacity of 18 MW. That figure is the capacity registered in REPD, which is the scheme as consented — the metered output of a site can differ.

Who operates Aurora Solar Farm?

REPD records the operator as Low Carbon UK Solar Investment Company. Ownership of built renewable assets changes hands regularly and REPD is published quarterly, so treat this as the operator of record rather than confirmation of who owns it today.

When was Aurora Solar Farm approved and built?

The application was submitted on 24 September 2019. Permission was granted on 22 April 2021, 19 months later. The site is recorded as under construction and has no operational date yet.

Source: Renewable Energy Planning Database (REPD), Department for Energy Security and Net Zero, Open Government Licence v3.0, plus planning designation boundaries from planning.data.gov.uk (England only). REPD is published quarterly and covers schemes of roughly 150 kW and above. Capacity is the installed capacity on record, not metered generation. Operator is the operator of record at the last extract, not confirmation of present ownership. Reference 7385.

Novarly Parcel · official public data, read properly · parcel.novarly.com

All sites · Screen your own site · Planning by council · Coal mining search by postcode