Renewable sites › Blenheim Net Zero Estate
Blenheim Net Zero Estate
Blenheim Net Zero Estate is a 5 MW solar farm under construction in West Oxfordshire. Planning permission was granted on 8 January 2021, 5 months after submission. Operator of record: Vanburgh Unit Trust.
Planning and build timeline
| Application submitted | 12 August 2020 |
| Permission granted | 8 January 2021 5 months after submission |
| Operational | not recorded |
Screening a site of your own?
West Oxfordshire approves 81% of solar farms. Redline puts that number, and everything else the record holds, against your own boundary: the authority’s actual approval rate and decision times, every designation inside the red line, agricultural grade, 1 m LIDAR earthworks, how contested the grid is, and yield with a P90 — before you spend on a consultant.
Arrives prefilled with Blenheim Net Zero Estate’s recorded coordinate — swap in your own postcode or coordinates.
What this site sits on
The recorded coordinate falls on land surveyed as Grade 3 agricultural land. The published survey does not split Grade 3 into 3a and 3b, so this alone does not settle whether the land counts as best and most versatile.
- Registered park or garden — BLENHEIM PALACE
- World Heritage Site — Blenheim Palace
REPD gives one representative coordinate per scheme, not the site boundary, so this describes the point on record rather than the whole site — a large site can straddle a designation edge. Boundaries come from planning.data.gov.uk, which publishes for England only.
West Oxfordshire’s record on solar
West Oxfordshire has decided 21 solar farms and approved 81%, taking a median of 3.2 months. See every solar farm decision in West Oxfordshire →
Other built sites within 15 km
| Site | MW | Distance |
|---|---|---|
Anaerobic Digestion · Operational | 2.1 | 5.7 km |
Solar Photovoltaics · Operational | 10.5 | 6.6 km |
Solar Photovoltaics · Operational | 13.2 | 7.6 km |
Battery · Under Construction | 18 | 8 km |
Solar Photovoltaics · Under Construction | 32 | 8 km |
Solar Photovoltaics · Operational | 4.5 | 8.1 km |
Solar Photovoltaics · Operational | 13 | 9.2 km |
EfW Incineration · Operational | 24 | 9.6 km |
How big is Blenheim Net Zero Estate?
Blenheim Net Zero Estate has a recorded installed capacity of 5 MW. That figure is the capacity registered in REPD, which is the scheme as consented — the metered output of a site can differ.
Who operates Blenheim Net Zero Estate?
REPD records the operator as Vanburgh Unit Trust. Ownership of built renewable assets changes hands regularly and REPD is published quarterly, so treat this as the operator of record rather than confirmation of who owns it today.
When was Blenheim Net Zero Estate approved and built?
The application was submitted on 12 August 2020. Permission was granted on 8 January 2021, 5 months later. The site is recorded as under construction and has no operational date yet.
Source: Renewable Energy Planning Database (REPD), Department for Energy Security and Net Zero, Open Government Licence v3.0, plus planning designation boundaries from planning.data.gov.uk (England only). REPD is published quarterly and covers schemes of roughly 150 kW and above. Capacity is the installed capacity on record, not metered generation. Operator is the operator of record at the last extract, not confirmation of present ownership. Reference 8069.
Novarly Parcel · official public data, read properly · parcel.novarly.com
All sites · Screen your own site · Planning by council · Coal mining search by postcode