Novarly ParcelRenewable sites

Renewable sitesBlenheim Net Zero Estate

Blenheim Net Zero Estate

Blenheim Net Zero Estate is a 5 MW solar farm under construction in West Oxfordshire. Planning permission was granted on 8 January 2021, 5 months after submission. Operator of record: Vanburgh Unit Trust.

5 MW
Capacity
as recorded in REPD
Under Construction
Status
no operational date
Solar Photovoltaics
Technology
Vanburgh Unit Trust
West Oxfordshire
Authority
England

Planning and build timeline

Application submitted12 August 2020
Permission granted8 January 2021
5 months after submission
Operationalnot recorded

Screening a site of your own?

RedlineUK · £39

West Oxfordshire approves 81% of solar farms. Redline puts that number, and everything else the record holds, against your own boundary: the authority’s actual approval rate and decision times, every designation inside the red line, agricultural grade, 1 m LIDAR earthworks, how contested the grid is, and yield with a P90 — before you spend on a consultant.

Screen a site here£39

Arrives prefilled with Blenheim Net Zero Estate’s recorded coordinate — swap in your own postcode or coordinates.

Consent ClockUK · Free

Granted years ago. Still not built. Every consented solar farm in the UK, computed against its statutory commencement deadline — which consents are about to lapse, and where.

Open Consent Clock →

What this site sits on

The recorded coordinate falls on land surveyed as Grade 3 agricultural land. The published survey does not split Grade 3 into 3a and 3b, so this alone does not settle whether the land counts as best and most versatile.

REPD gives one representative coordinate per scheme, not the site boundary, so this describes the point on record rather than the whole site — a large site can straddle a designation edge. Boundaries come from planning.data.gov.uk, which publishes for England only.

West Oxfordshire’s record on solar

West Oxfordshire has decided 21 solar farms and approved 81%, taking a median of 3.2 months. See every solar farm decision in West Oxfordshire

Other built sites within 15 km

SiteMWDistance
Anaerobic Digestion · Operational
2.15.7 km
Solar Photovoltaics · Operational
10.56.6 km
Solar Photovoltaics · Operational
13.27.6 km
Battery · Under Construction
188 km
Solar Photovoltaics · Under Construction
328 km
Solar Photovoltaics · Operational
4.58.1 km
Solar Photovoltaics · Operational
139.2 km
EfW Incineration · Operational
249.6 km

How big is Blenheim Net Zero Estate?

Blenheim Net Zero Estate has a recorded installed capacity of 5 MW. That figure is the capacity registered in REPD, which is the scheme as consented — the metered output of a site can differ.

Who operates Blenheim Net Zero Estate?

REPD records the operator as Vanburgh Unit Trust. Ownership of built renewable assets changes hands regularly and REPD is published quarterly, so treat this as the operator of record rather than confirmation of who owns it today.

When was Blenheim Net Zero Estate approved and built?

The application was submitted on 12 August 2020. Permission was granted on 8 January 2021, 5 months later. The site is recorded as under construction and has no operational date yet.

Source: Renewable Energy Planning Database (REPD), Department for Energy Security and Net Zero, Open Government Licence v3.0, plus planning designation boundaries from planning.data.gov.uk (England only). REPD is published quarterly and covers schemes of roughly 150 kW and above. Capacity is the installed capacity on record, not metered generation. Operator is the operator of record at the last extract, not confirmation of present ownership. Reference 8069.

Novarly Parcel · official public data, read properly · parcel.novarly.com

All sites · Screen your own site · Planning by council · Coal mining search by postcode