Renewable sites › Ducklington Solar Farm
Ducklington Solar Farm
Ducklington Solar Farm is under construction in West Oxfordshire with a recorded capacity of 36 MW.
Planning and build timeline
| Application submitted | 2021-04-08 |
| Permission granted | 2022-03-01 11 months after submission |
| Operational | not recorded |
What this site sits on
The recorded coordinate falls on land surveyed as Grade 3 agricultural land. The published survey does not split Grade 3 into 3a and 3b, so this alone does not settle whether the land counts as best and most versatile.
REPD gives one representative coordinate per scheme, not the site boundary, so this describes the point on record rather than the whole site — a large site can straddle a designation edge. Boundaries come from planning.data.gov.uk, which publishes for England only.
West Oxfordshire’s record on solar
West Oxfordshire has decided 21 solar farms and approved 81%, taking a median of 3.2 months. See every solar farm decision in West Oxfordshire →
Other built sites within 15 km
| Site | MW | Distance |
|---|---|---|
Eynsham Solar Farm Solar Photovoltaics · Operational | 13.2 | 6.3 km |
Aurora Solar Farm Battery · Under Construction | 18 | 7.2 km |
Aurora Solar Farm Solar Photovoltaics · Under Construction | 32 | 7.2 km |
Westerfield Farm Solar Photovoltaics · Operational | 12.5 | 7.5 km |
Kencot Hill Solar Farm Solar Photovoltaics · Operational | 37 | 9.4 km |
Southill Solar Solar Photovoltaics · Operational | 4.5 | 10.7 km |
Cassington AD (Waste AD) Anaerobic Digestion · Operational | 2.1 | 12.6 km |
Blenheim Net Zero Estate Solar Photovoltaics · Under Construction | 5 | 13.6 km |
How big is Ducklington Solar Farm?
Ducklington Solar Farm has a recorded installed capacity of 36 MW. That figure is the capacity registered in REPD, which is the scheme as consented — the metered output of a site can differ.
Who operates Ducklington Solar Farm?
REPD records the operator as Novus Renewable Services / Innova Renewables. Ownership of built renewable assets changes hands regularly and REPD is published quarterly, so treat this as the operator of record rather than confirmation of who owns it today.
When was Ducklington Solar Farm approved and built?
The application was submitted on 2021-04-08. Permission was granted on 2022-03-01, 11 months later. The site is recorded as under construction and has no operational date yet.
Source: Renewable Energy Planning Database (REPD), Department for Energy Security and Net Zero, Open Government Licence v3.0, plus planning designation boundaries from planning.data.gov.uk (England only). REPD is published quarterly and covers schemes of roughly 150 kW and above. Capacity is the installed capacity on record, not metered generation. Operator is the operator of record at the last extract, not confirmation of present ownership. Reference 9090.