Renewable sites › Ducklington Solar Farm
Ducklington Solar Farm
Ducklington Solar Farm is a 36 MW solar farm under construction in West Oxfordshire. Planning permission was granted on 1 March 2022, 11 months after submission. Operator of record: Novus Renewable Services / Innova Renewables.
Planning and build timeline
| Application submitted | 8 April 2021 |
| Permission granted | 1 March 2022 11 months after submission |
| Operational | not recorded |
Screening a site of your own?
West Oxfordshire approves 81% of solar farms. Redline puts that number, and everything else the record holds, against your own boundary: the authority’s actual approval rate and decision times, every designation inside the red line, agricultural grade, 1 m LIDAR earthworks, how contested the grid is, and yield with a P90 — before you spend on a consultant.
Arrives prefilled with Ducklington Solar Farm’s recorded coordinate — swap in your own postcode or coordinates.
What this site sits on
The recorded coordinate falls on land surveyed as Grade 3 agricultural land. The published survey does not split Grade 3 into 3a and 3b, so this alone does not settle whether the land counts as best and most versatile.
REPD gives one representative coordinate per scheme, not the site boundary, so this describes the point on record rather than the whole site — a large site can straddle a designation edge. Boundaries come from planning.data.gov.uk, which publishes for England only.
West Oxfordshire’s record on solar
West Oxfordshire has decided 21 solar farms and approved 81%, taking a median of 3.2 months. See every solar farm decision in West Oxfordshire →
Other built sites within 15 km
| Site | MW | Distance |
|---|---|---|
Solar Photovoltaics · Operational | 13.2 | 6.3 km |
Solar Photovoltaics · Under Construction | 32 | 7.2 km |
Battery · Under Construction | 18 | 7.2 km |
Solar Photovoltaics · Operational | 12.5 | 7.5 km |
Solar Photovoltaics · Operational | 37 | 9.4 km |
Solar Photovoltaics · Operational | 4.5 | 10.7 km |
Anaerobic Digestion · Operational | 2.1 | 12.6 km |
Solar Photovoltaics · Under Construction | 5 | 13.6 km |
How big is Ducklington Solar Farm?
Ducklington Solar Farm has a recorded installed capacity of 36 MW. That figure is the capacity registered in REPD, which is the scheme as consented — the metered output of a site can differ.
Who operates Ducklington Solar Farm?
REPD records the operator as Novus Renewable Services / Innova Renewables. Ownership of built renewable assets changes hands regularly and REPD is published quarterly, so treat this as the operator of record rather than confirmation of who owns it today.
When was Ducklington Solar Farm approved and built?
The application was submitted on 8 April 2021. Permission was granted on 1 March 2022, 11 months later. The site is recorded as under construction and has no operational date yet.
Source: Renewable Energy Planning Database (REPD), Department for Energy Security and Net Zero, Open Government Licence v3.0, plus planning designation boundaries from planning.data.gov.uk (England only). REPD is published quarterly and covers schemes of roughly 150 kW and above. Capacity is the installed capacity on record, not metered generation. Operator is the operator of record at the last extract, not confirmation of present ownership. Reference 9090.
Novarly Parcel · official public data, read properly · parcel.novarly.com
All sites · Screen your own site · Planning by council · Coal mining search by postcode