Renewable sites › Asfordby Business Park (1)
Asfordby Business Park (1)
Asfordby Business Park (1) is operational in Melton with a recorded capacity of 23.4 MW, and has been generating since 2019-04-01.
Planning and build timeline
| Application submitted | 2016-08-01 |
| Permission granted | 2016-09-30 2 months after submission |
| Operational | 2019-04-01 30 months after consent |
What this site sits on
The recorded coordinate falls on land surveyed as Grade 3 agricultural land. The published survey does not split Grade 3 into 3a and 3b, so this alone does not settle whether the land counts as best and most versatile.
REPD gives one representative coordinate per scheme, not the site boundary, so this describes the point on record rather than the whole site — a large site can straddle a designation edge. Boundaries come from planning.data.gov.uk, which publishes for England only.
Other built sites within 15 km
| Site | MW | Distance |
|---|---|---|
Land to the west of Ashfordby Business Park Solar Photovoltaics · Operational | 3.5 | 0.9 km |
Six Hills Solar Farm Solar Photovoltaics · Operational | 18.7 | 6.9 km |
Dalby Wind Onshore · Operational | 7.2 | 8 km |
The Sawmill Biomass (dedicated) · Operational | 6.8 | 10 km |
GDL Wymeswold Solar Farm/land off the A6006 Solar Photovoltaics · Operational | 6.1 | 11.5 km |
Land to the East of Burton Lane Solar Photovoltaics · Operational | 2.6 | 12.9 km |
Wymeswold Airfield Solar Photovoltaics · Operational | 34 | 12.9 km |
Gypsom Solar Farm Solar Photovoltaics · Operational | 5 | 13.7 km |
How big is Asfordby Business Park (1)?
Asfordby Business Park (1) has a recorded installed capacity of 23.4 MW. That figure is the capacity registered in REPD, which is the scheme as consented — the metered output of a site can differ.
Who operates Asfordby Business Park (1)?
REPD records the operator as UK Power Reserve. Ownership of built renewable assets changes hands regularly and REPD is published quarterly, so treat this as the operator of record rather than confirmation of who owns it today.
When was Asfordby Business Park (1) approved and built?
The application was submitted on 2016-08-01. Permission was granted on 2016-09-30, 2 months later. The site became operational on 2019-04-01, 30 months after consent.
Source: Renewable Energy Planning Database (REPD), Department for Energy Security and Net Zero, Open Government Licence v3.0, plus planning designation boundaries from planning.data.gov.uk (England only). REPD is published quarterly and covers schemes of roughly 150 kW and above. Capacity is the installed capacity on record, not metered generation. Operator is the operator of record at the last extract, not confirmation of present ownership. Reference 6932.
Novarly Parcel · official public data, read properly · parcel.novarly.com