GDL Wymeswold Solar Farm/land off the A6006
GDL Wymeswold Solar Farm/land off the A6006 is operational in Charnwood with a recorded capacity of 6.1 MW, and has been generating since 2016-02-16.
Planning and build timeline
| Application submitted | 2014-08-07 |
| Permission granted | 2015-02-11 6 months after submission |
| Operational | 2016-02-16 12 months after consent |
What this site sits on
The recorded coordinate falls on land surveyed as Grade 3 agricultural land. The published survey does not split Grade 3 into 3a and 3b, so this alone does not settle whether the land counts as best and most versatile.
REPD gives one representative coordinate per scheme, not the site boundary, so this describes the point on record rather than the whole site — a large site can straddle a designation edge. Boundaries come from planning.data.gov.uk, which publishes for England only.
Charnwood’s record on solar
Charnwood has decided 18 solar farms and approved 94%, taking a median of 5.5 months. See every solar farm decision in Charnwood →
Other built sites within 15 km
| Site | MW | Distance |
|---|---|---|
Land to the East of Burton Lane Solar Photovoltaics · Operational | 2.6 | 1.8 km |
Wymeswold Airfield Solar Photovoltaics · Operational | 34 | 1.8 km |
Dalby Wind Onshore · Operational | 7.2 | 3.6 km |
The Sawmill Biomass (dedicated) · Operational | 6.8 | 5 km |
Six Hills Solar Farm Solar Photovoltaics · Operational | 18.7 | 5.2 km |
British Geological, Keywork Solar Panels Solar Photovoltaics · Under Construction | 0.62 | 7.8 km |
Gypsom Solar Farm Solar Photovoltaics · Operational | 5 | 8 km |
Mountsorrel Landfill Site Landfill Gas · Operational | 1.6 | 10 km |
How big is GDL Wymeswold Solar Farm/land off the A6006?
GDL Wymeswold Solar Farm/land off the A6006 has a recorded installed capacity of 6.1 MW. That figure is the capacity registered in REPD, which is the scheme as consented — the metered output of a site can differ.
Who operates GDL Wymeswold Solar Farm/land off the A6006?
REPD records the operator as Green Switch Solutions. Ownership of built renewable assets changes hands regularly and REPD is published quarterly, so treat this as the operator of record rather than confirmation of who owns it today.
When was GDL Wymeswold Solar Farm/land off the A6006 approved and built?
The application was submitted on 2014-08-07. Permission was granted on 2015-02-11, 6 months later. The site became operational on 2016-02-16, 12 months after consent.
Source: Renewable Energy Planning Database (REPD), Department for Energy Security and Net Zero, Open Government Licence v3.0, plus planning designation boundaries from planning.data.gov.uk (England only). REPD is published quarterly and covers schemes of roughly 150 kW and above. Capacity is the installed capacity on record, not metered generation. Operator is the operator of record at the last extract, not confirmation of present ownership. Reference 2237.