Renewable sites › Calvert Phase II
Calvert Phase II
Calvert Phase II is an operational 11.2 MW landfill gas site in Buckinghamshire, generating since 2 February 2003. Planning permission was granted on 21 October 2002, 3 months after submission. Operator of record: Waste Recycling Group.
Planning and build timeline
| Application submitted | 11 July 2002 |
| Permission granted | 21 October 2002 3 months after submission |
| Operational | 2 February 2003 3 months after consent |
Screening a site of your own?
Redline runs the record on your own boundary in Buckinghamshire: the authority’s actual approval rate and decision times, every designation inside the red line, agricultural grade, 1 m LIDAR earthworks, how contested the grid is, and yield with a P90 — before you spend on a consultant.
Arrives prefilled with Calvert Phase II’s recorded coordinate — swap in your own postcode or coordinates.
What this site sits on
The recorded coordinate falls on land surveyed as Grade 4 agricultural land.
REPD gives one representative coordinate per scheme, not the site boundary, so this describes the point on record rather than the whole site — a large site can straddle a designation edge. Boundaries come from planning.data.gov.uk, which publishes for England only.
Other built sites within 15 km
| Site | MW | Distance |
|---|---|---|
EfW Incineration · Operational | 22 | 1.6 km |
Anaerobic Digestion · Operational | 2 | 5.7 km |
Solar Photovoltaics · Operational | 1.3 | 6.6 km |
Solar Photovoltaics · Operational | 22 | 9.4 km |
Battery · Operational | — | 9.6 km |
Solar Photovoltaics · Operational | 9.2 | 9.9 km |
Solar Photovoltaics · Operational | 0.2 | 9.9 km |
Solar Photovoltaics · Under Construction | 19 | 10.7 km |
How big is Calvert Phase II?
Calvert Phase II has a recorded installed capacity of 11.2 MW. That figure is the capacity registered in REPD, which is the scheme as consented — the metered output of a site can differ.
Who operates Calvert Phase II?
REPD records the operator as Waste Recycling Group. Ownership of built renewable assets changes hands regularly and REPD is published quarterly, so treat this as the operator of record rather than confirmation of who owns it today.
When was Calvert Phase II approved and built?
The application was submitted on 11 July 2002. Permission was granted on 21 October 2002, 3 months later. The site became operational on 2 February 2003, 3 months after consent.
Source: Renewable Energy Planning Database (REPD), Department for Energy Security and Net Zero, Open Government Licence v3.0, plus planning designation boundaries from planning.data.gov.uk (England only). REPD is published quarterly and covers schemes of roughly 150 kW and above. Capacity is the installed capacity on record, not metered generation. Operator is the operator of record at the last extract, not confirmation of present ownership. Reference 537.
Novarly Parcel · official public data, read properly · parcel.novarly.com
All sites · Screen your own site · Planning by council · Coal mining search by postcode