Novarly ParcelRenewable sites

Renewable sitesCalvert Phase II

Calvert Phase II

Calvert Phase II is operational in Buckinghamshire with a recorded capacity of 11.2 MW, and has been generating since 2003-02-02.

11.2 MW
Capacity
as recorded in REPD
Operational
Status
since 2003-02-02
Landfill Gas
Technology
Waste Recycling Group
Buckinghamshire
Authority
England

Planning and build timeline

Application submitted2002-07-11
Permission granted2002-10-21
3 months after submission
Operational2003-02-02
3 months after consent

What this site sits on

The recorded coordinate falls on land surveyed as Grade 4 agricultural land.

REPD gives one representative coordinate per scheme, not the site boundary, so this describes the point on record rather than the whole site — a large site can straddle a designation edge. Boundaries come from planning.data.gov.uk, which publishes for England only.

Other built sites within 15 km

SiteMWDistance
Greatmoor EfW
EfW Incineration · Operational
221.6 km
Westcott Venture Park
Anaerobic Digestion · Operational
25.7 km
Westcott Venture Park Phase 2 & 3
Solar Photovoltaics · Operational
1.36.6 km
Fox Covert Solar Farm
Solar Photovoltaics · Operational
229.4 km
Fox Covert Solar Farm
Battery · Operational
9.6 km
Gawcott Fields Farm
Solar Photovoltaics · Operational
9.29.9 km
Buckingham Tesco Superstore
Solar Photovoltaics · Operational
0.29.9 km
Ray Valley Solar Farm
Solar Photovoltaics · Under Construction
1910.7 km

How big is Calvert Phase II?

Calvert Phase II has a recorded installed capacity of 11.2 MW. That figure is the capacity registered in REPD, which is the scheme as consented — the metered output of a site can differ.

Who operates Calvert Phase II?

REPD records the operator as Waste Recycling Group. Ownership of built renewable assets changes hands regularly and REPD is published quarterly, so treat this as the operator of record rather than confirmation of who owns it today.

When was Calvert Phase II approved and built?

The application was submitted on 2002-07-11. Permission was granted on 2002-10-21, 3 months later. The site became operational on 2003-02-02, 3 months after consent.

Source: Renewable Energy Planning Database (REPD), Department for Energy Security and Net Zero, Open Government Licence v3.0, plus planning designation boundaries from planning.data.gov.uk (England only). REPD is published quarterly and covers schemes of roughly 150 kW and above. Capacity is the installed capacity on record, not metered generation. Operator is the operator of record at the last extract, not confirmation of present ownership. Reference 537.