Novarly ParcelRenewable sites

Renewable sitesScouthead Power Plant

Scouthead Power Plant

Scouthead Power Plant is operational in Oldham with a recorded capacity of 2.9 MW, and has been generating since 2003-09-25.

2.9 MW
Capacity
as recorded in REPD
Operational
Status
since 2003-09-25
Landfill Gas
Technology
ONYX
Oldham
Authority
England

Planning and build timeline

Application submitted2001-01-02
Permission granted2001-10-11
9 months after submission
Operational2003-09-25
23 months after consent

What this site sits on

The recorded coordinate falls on land surveyed as Grade 4 agricultural land.

REPD gives one representative coordinate per scheme, not the site boundary, so this describes the point on record rather than the whole site — a large site can straddle a designation edge. Boundaries come from planning.data.gov.uk, which publishes for England only.

Other built sites within 15 km

SiteMWDistance
Whitegate Battery Storage
Battery · Under Construction
578.8 km
Land at Wrigley Head
Solar Photovoltaics · Under Construction
0.98.8 km
Chadderton - Battery energy storage facility
Battery · Under Construction
208.8 km
Astra Centre, Royal Barn Road - Energy Storage
Battery · Under Construction
4010.3 km
Gipsy Lane
Battery · Under Construction
2010.4 km
Reliance Street Mechanical Biological Treatment Facility (MBT)
Anaerobic Digestion · Operational
211 km
Godley Water Treatment Works
Solar Photovoltaics · Operational
311.2 km
Chamber House
Solar Photovoltaics · Under Construction
3.9912.2 km

How big is Scouthead Power Plant?

Scouthead Power Plant has a recorded installed capacity of 2.9 MW. That figure is the capacity registered in REPD, which is the scheme as consented — the metered output of a site can differ.

Who operates Scouthead Power Plant?

REPD records the operator as ONYX. Ownership of built renewable assets changes hands regularly and REPD is published quarterly, so treat this as the operator of record rather than confirmation of who owns it today.

When was Scouthead Power Plant approved and built?

The application was submitted on 2001-01-02. Permission was granted on 2001-10-11, 9 months later. The site became operational on 2003-09-25, 23 months after consent.

Source: Renewable Energy Planning Database (REPD), Department for Energy Security and Net Zero, Open Government Licence v3.0, plus planning designation boundaries from planning.data.gov.uk (England only). REPD is published quarterly and covers schemes of roughly 150 kW and above. Capacity is the installed capacity on record, not metered generation. Operator is the operator of record at the last extract, not confirmation of present ownership. Reference 709.

Novarly Parcel · official public data, read properly · parcel.novarly.com

All sites · Screen your own site · Planning by council