Scouthead Power Plant is an operational 2.9 MW landfill gas site in Oldham, generating since 25 September 2003. Planning permission was granted on 11 October 2001, 9 months after submission. Operator of record: ONYX.

2.9 MW
Capacity
as recorded in REPD
Operational
Status
since 25 September 2003
Landfill Gas
Technology
ONYX
Oldham
Authority
England

Planning and build timeline

Application submitted2 January 2001
Permission granted11 October 2001
9 months after submission
Operational25 September 2003
23 months after consent

Screening a site of your own?

RedlineUK · £39

Redline runs the record on your own boundary in Oldham: the authority’s actual approval rate and decision times, every designation inside the red line, agricultural grade, 1 m LIDAR earthworks, how contested the grid is, and yield with a P90 — before you spend on a consultant.

Screen a site here£39

Arrives prefilled with Scouthead Power Plant’s recorded coordinate — swap in your own postcode or coordinates.

Consent ClockUK · Free

Granted years ago. Still not built. Every consented solar, battery or onshore wind scheme in the UK, computed against its statutory commencement deadline — which consents are about to lapse, and where.

Open Consent Clock →

What this site sits on

The recorded coordinate falls on land surveyed as Grade 4 agricultural land.

REPD gives one representative coordinate per scheme, not the site boundary, so this describes the point on record rather than the whole site — a large site can straddle a designation edge. Boundaries come from planning.data.gov.uk, which publishes for England only.

Other built sites within 15 km

SiteMWDistance
Battery · Under Construction
578.8 km
Solar Photovoltaics · Under Construction
0.98.8 km
Battery · Under Construction
208.8 km
Battery · Under Construction
4010.3 km
Battery · Under Construction
2010.4 km
Anaerobic Digestion · Operational
211 km
Solar Photovoltaics · Operational
311.2 km
Solar Photovoltaics · Under Construction
3.9912.2 km

How big is Scouthead Power Plant?

Scouthead Power Plant has a recorded installed capacity of 2.9 MW. That figure is the capacity registered in REPD, which is the scheme as consented — the metered output of a site can differ.

Who operates Scouthead Power Plant?

REPD records the operator as ONYX. Ownership of built renewable assets changes hands regularly and REPD is published quarterly, so treat this as the operator of record rather than confirmation of who owns it today.

When was Scouthead Power Plant approved and built?

The application was submitted on 2 January 2001. Permission was granted on 11 October 2001, 9 months later. The site became operational on 25 September 2003, 23 months after consent.

Source: Renewable Energy Planning Database (REPD), Department for Energy Security and Net Zero, Open Government Licence v3.0, plus planning designation boundaries from planning.data.gov.uk (England only). REPD is published quarterly and covers schemes of roughly 150 kW and above. Capacity is the installed capacity on record, not metered generation. Operator is the operator of record at the last extract, not confirmation of present ownership. Reference 709.

Novarly Parcel · official public data, read properly · parcel.novarly.com

All sites · Screen your own site · Planning by council · Coal mining search by postcode