Renewable sites › Meadow Lane Solar Farm
Meadow Lane Solar Farm
Meadow Lane Solar Farm is under construction in Amber Valley with a recorded capacity of 19.6 MW.
Planning and build timeline
| Application submitted | 2021-04-09 |
| Permission granted | 2021-10-21 6 months after submission |
| Operational | not recorded |
What this site sits on
The recorded coordinate falls on land surveyed as Grade 4 agricultural land.
REPD gives one representative coordinate per scheme, not the site boundary, so this describes the point on record rather than the whole site — a large site can straddle a designation edge. Boundaries come from planning.data.gov.uk, which publishes for England only.
Amber Valley’s record on solar
Amber Valley has decided 15 solar farms and approved 67%, taking a median of 2.9 months. See every solar farm decision in Amber Valley →
Other built sites within 15 km
| Site | MW | Distance |
|---|---|---|
Twin Yards Solar Farm Solar Photovoltaics · Operational | 5 | 3.8 km |
Padleywood Farm Solar Photovoltaics · Operational | 5 | 4.6 km |
Averhill Farm Solar Photovoltaics · Operational | 5 | 4.6 km |
Land North of the Wood at Averill Farm Solar Photovoltaics · Operational | 5 | 4.6 km |
Crow Trees Farm Solar Photovoltaics · Operational | 4.7 | 5.1 km |
Sutton Landfill Site Landfill Gas · Operational | 3 | 6.6 km |
SC Johnson, Denby - Solar Panels Solar Photovoltaics · Under Construction | 0.62 | 9.4 km |
Glapwell Power Landfill Gas · Operational | 2 | 10.8 km |
How big is Meadow Lane Solar Farm?
Meadow Lane Solar Farm has a recorded installed capacity of 19.6 MW. That figure is the capacity registered in REPD, which is the scheme as consented — the metered output of a site can differ.
Who operates Meadow Lane Solar Farm?
REPD records the operator as Gresham House / Anesco Limited. Ownership of built renewable assets changes hands regularly and REPD is published quarterly, so treat this as the operator of record rather than confirmation of who owns it today.
When was Meadow Lane Solar Farm approved and built?
The application was submitted on 2021-04-09. Permission was granted on 2021-10-21, 6 months later. The site is recorded as under construction and has no operational date yet.
Source: Renewable Energy Planning Database (REPD), Department for Energy Security and Net Zero, Open Government Licence v3.0, plus planning designation boundaries from planning.data.gov.uk (England only). REPD is published quarterly and covers schemes of roughly 150 kW and above. Capacity is the installed capacity on record, not metered generation. Operator is the operator of record at the last extract, not confirmation of present ownership. Reference 8897.