Saron Road solar park
Saron Road solar park is an operational 6.7 MW solar farm in Carmarthenshire, generating since 15 February 2015. Planning permission was granted on 19 September 2013, 5 months after submission. Operator of record: Anesco.
Planning and build timeline
| Application submitted | 12 April 2013 |
| Permission granted | 19 September 2013 5 months after submission |
| Operational | 15 February 2015 17 months after consent |
Screening a site of your own?
Carmarthenshire approves 93% of solar farms. Redline puts that number, and everything else the record holds, against your own boundary: the authority’s actual approval rate and decision times, every designation inside the red line, agricultural grade, 1 m LIDAR earthworks, how contested the grid is, and yield with a P90 — before you spend on a consultant.
Arrives prefilled with Saron Road solar park’s recorded coordinate — swap in your own postcode or coordinates.
Carmarthenshire’s record on solar
Carmarthenshire has decided 28 solar farms and approved 93%, taking a median of 4.8 months. See every solar farm decision in Carmarthenshire →
Other built sites within 15 km
| Site | MW | Distance |
|---|---|---|
Solar Photovoltaics · Operational | 6.9 | 1.1 km |
Solar Photovoltaics · Operational | 13.5 | 3 km |
Solar Photovoltaics · Operational | 9 | 5.2 km |
Wind Onshore · Operational | 34.5 | 6.7 km |
Wind Onshore · Operational | 32.8 | 7.5 km |
Solar Photovoltaics · Operational | 5.5 | 8.3 km |
Solar Photovoltaics · Operational | 1.5 | 8.5 km |
Solar Photovoltaics · Operational | 6 | 10.7 km |
How big is Saron Road solar park?
Saron Road solar park has a recorded installed capacity of 6.7 MW. That figure is the capacity registered in REPD, which is the scheme as consented — the metered output of a site can differ.
Who operates Saron Road solar park?
REPD records the operator as Anesco. Ownership of built renewable assets changes hands regularly and REPD is published quarterly, so treat this as the operator of record rather than confirmation of who owns it today.
When was Saron Road solar park approved and built?
The application was submitted on 12 April 2013. Permission was granted on 19 September 2013, 5 months later. The site became operational on 15 February 2015, 17 months after consent.
Source: Renewable Energy Planning Database (REPD), Department for Energy Security and Net Zero, Open Government Licence v3.0, plus planning designation boundaries from planning.data.gov.uk (England only). REPD is published quarterly and covers schemes of roughly 150 kW and above. Capacity is the installed capacity on record, not metered generation. Operator is the operator of record at the last extract, not confirmation of present ownership. Reference 2355.
Novarly Parcel · official public data, read properly · parcel.novarly.com
All sites · Screen your own site · Planning by council · Coal mining search by postcode