Saltend Wind Turbine is operational in East Riding of Yorkshire with a recorded capacity of 1.3 MW, and has been generating since 2007-11-01.

1.3 MW
Capacity
as recorded in REPD
Operational
Status
since 2007-11-01
Wind Onshore
Technology
Yorkshire Water
East Riding of Yorkshire
Authority
England

Planning and build timeline

Application submitted2005-12-07
Permission granted2006-03-06
3 months after submission
Operational2007-11-01
20 months after consent

What this site sits on

The recorded coordinate falls on land surveyed as Urban agricultural land.

REPD gives one representative coordinate per scheme, not the site boundary, so this describes the point on record rather than the whole site — a large site can straddle a designation edge. Boundaries come from planning.data.gov.uk, which publishes for England only.

East Riding of Yorkshire’s record on onshore wind

East Riding of Yorkshire has decided 55 onshore wind schemes and approved 82%, taking a median of 7.8 months. See every onshore wind scheme decision in East Riding of Yorkshire

Other built sites within 15 km

SiteMWDistance
The Limes Wind Turbines
Wind Onshore · Operational
1.70.8 km
King George Dock
Biomass (dedicated) · Operational
93.1 km
Hull Solar Farm
Solar Photovoltaics · Under Construction
25.73.2 km
Energy Works Hull - AD (Waste AD)
Anaerobic Digestion · Operational
36.4 km
Energy Works (Hull)
Advanced Conversion Technologies · Operational
256.4 km
Energy Works Hull - Wind Turbine
Wind Onshore · Operational
36.4 km
Samaritans Spring Bank Solar Panels
Solar Photovoltaics · Operational
7.6 km
Burton Pidsea (Wadworth Hill) Wind Farm
Wind Onshore · Operational
10.28.1 km

How big is Saltend Wind Turbine?

Saltend Wind Turbine has a recorded installed capacity of 1.3 MW. That figure is the capacity registered in REPD, which is the scheme as consented — the metered output of a site can differ.

Who operates Saltend Wind Turbine?

REPD records the operator as Yorkshire Water. Ownership of built renewable assets changes hands regularly and REPD is published quarterly, so treat this as the operator of record rather than confirmation of who owns it today.

When was Saltend Wind Turbine approved and built?

The application was submitted on 2005-12-07. Permission was granted on 2006-03-06, 3 months later. The site became operational on 2007-11-01, 20 months after consent.

Source: Renewable Energy Planning Database (REPD), Department for Energy Security and Net Zero, Open Government Licence v3.0, plus planning designation boundaries from planning.data.gov.uk (England only). REPD is published quarterly and covers schemes of roughly 150 kW and above. Capacity is the installed capacity on record, not metered generation. Operator is the operator of record at the last extract, not confirmation of present ownership. Reference 2942.

Novarly Parcel · official public data, read properly · parcel.novarly.com

All sites · Screen your own site · Planning by council