Novarly ParcelRenewable sites

Renewable sitesBuilding ONE

Building ONE

Building ONE is under construction in Swindon with a recorded capacity of 1.2 MW.

1.2 MW
Capacity
as recorded in REPD
Under Construction
Status
no operational date
Solar Photovoltaics
Technology
Science Museum Group
Swindon
Authority
England

Planning and build timeline

Application submitted2019-02-19
Permission granted2019-06-04
3 months after submission
Operationalnot recorded

What this site sits on

The recorded coordinate falls on land surveyed as Non Agricultural agricultural land.

REPD gives one representative coordinate per scheme, not the site boundary, so this describes the point on record rather than the whole site — a large site can straddle a designation edge. Boundaries come from planning.data.gov.uk, which publishes for England only.

Swindon’s record on solar

Swindon has decided 35 solar farms and approved 100%, taking a median of 2.1 months. See every solar farm decision in Swindon

Other built sites within 15 km

SiteMWDistance
Wroughton Airfield Solar Park
Solar Photovoltaics · Operational
410.8 km
Lower Basset Down Farm
Solar Photovoltaics · Operational
10.51.7 km
Common Farm
Solar Photovoltaics · Operational
4.82.8 km
Mannington Battery Storage Plant
Battery · Operational
49.94.9 km
Rock Farm / Goldborough Farm (Rookwood)
Solar Photovoltaics · Operational
55.6 km
Wickfield Farm
Solar Photovoltaics · Operational
55.9 km
Swindon Sewerage Treatment Works
Anaerobic Digestion · Operational
1.26.4 km
Spittleborough Farm
Solar Photovoltaics · Operational
126.8 km

How big is Building ONE?

Building ONE has a recorded installed capacity of 1.2 MW. That figure is the capacity registered in REPD, which is the scheme as consented — the metered output of a site can differ.

Who operates Building ONE?

REPD records the operator as Science Museum Group. Ownership of built renewable assets changes hands regularly and REPD is published quarterly, so treat this as the operator of record rather than confirmation of who owns it today.

When was Building ONE approved and built?

The application was submitted on 2019-02-19. Permission was granted on 2019-06-04, 3 months later. The site is recorded as under construction and has no operational date yet.

Source: Renewable Energy Planning Database (REPD), Department for Energy Security and Net Zero, Open Government Licence v3.0, plus planning designation boundaries from planning.data.gov.uk (England only). REPD is published quarterly and covers schemes of roughly 150 kW and above. Capacity is the installed capacity on record, not metered generation. Operator is the operator of record at the last extract, not confirmation of present ownership. Reference 7252.