Risley '4' Landfill Scheme is an operational 5.9 MW landfill gas site in Warrington, generating since 1 May 1999. Planning permission was granted on 17 March 1997, 4 months after submission. Operator of record: Biffa.

5.9 MW
Capacity
as recorded in REPD
Operational
Status
since 1 May 1999
Landfill Gas
Technology
Biffa
Warrington
Authority
England

Planning and build timeline

Application submitted8 November 1996
Permission granted17 March 1997
4 months after submission
Operational1 May 1999
25 months after consent

Screening a site of your own?

RedlineUK · £39

Redline runs the record on your own boundary in Warrington: the authority’s actual approval rate and decision times, every designation inside the red line, agricultural grade, 1 m LIDAR earthworks, how contested the grid is, and yield with a P90 — before you spend on a consultant.

Screen a site here£39

Arrives prefilled with Risley '4' Landfill Scheme’s recorded coordinate — swap in your own postcode or coordinates.

Consent ClockUK · Free

Granted years ago. Still not built. Every consented solar, battery or onshore wind scheme in the UK, computed against its statutory commencement deadline — which consents are about to lapse, and where.

Open Consent Clock →

What this site sits on

The recorded coordinate falls on land surveyed as Grade 3 agricultural land. The published survey does not split Grade 3 into 3a and 3b, so this alone does not settle whether the land counts as best and most versatile.

REPD gives one representative coordinate per scheme, not the site boundary, so this describes the point on record rather than the whole site — a large site can straddle a designation edge. Boundaries come from planning.data.gov.uk, which publishes for England only.

Other built sites within 15 km

SiteMWDistance
Landfill Gas · Operational
2.10.2 km
Landfill Gas · Operational
20.2 km
Landfill Gas · Operational
34.6 km
Biomass (dedicated) · Operational
41.65.9 km
Landfill Gas · Operational
5.37.1 km
Solar Photovoltaics · Operational
5.38.5 km
Solar Photovoltaics · Operational
0.59.6 km
Battery · Operational
3010 km

How big is Risley '4' Landfill Scheme?

Risley '4' Landfill Scheme has a recorded installed capacity of 5.9 MW. That figure is the capacity registered in REPD, which is the scheme as consented — the metered output of a site can differ.

Who operates Risley '4' Landfill Scheme?

REPD records the operator as Biffa. Ownership of built renewable assets changes hands regularly and REPD is published quarterly, so treat this as the operator of record rather than confirmation of who owns it today.

When was Risley '4' Landfill Scheme approved and built?

The application was submitted on 8 November 1996. Permission was granted on 17 March 1997, 4 months later. The site became operational on 1 May 1999, 25 months after consent.

Source: Renewable Energy Planning Database (REPD), Department for Energy Security and Net Zero, Open Government Licence v3.0, plus planning designation boundaries from planning.data.gov.uk (England only). REPD is published quarterly and covers schemes of roughly 150 kW and above. Capacity is the installed capacity on record, not metered generation. Operator is the operator of record at the last extract, not confirmation of present ownership. Reference 572.

Novarly Parcel · official public data, read properly · parcel.novarly.com

All sites · Screen your own site · Planning by council · Coal mining search by postcode