Novarly ParcelRenewable sites

Renewable sitesRisley

Risley

Risley is operational in Warrington with a recorded capacity of 2 MW, and has been generating since 2003-11-01.

2 MW
Capacity
as recorded in REPD
Operational
Status
since 2003-11-01
Landfill Gas
Technology
Biffa
Warrington
Authority
England

Planning and build timeline

Application submitted2002-04-12
Permission granted2003-06-01
14 months after submission
Operational2003-11-01
5 months after consent

What this site sits on

The recorded coordinate falls on land surveyed as Grade 3 agricultural land. The published survey does not split Grade 3 into 3a and 3b, so this alone does not settle whether the land counts as best and most versatile.

REPD gives one representative coordinate per scheme, not the site boundary, so this describes the point on record rather than the whole site — a large site can straddle a designation edge. Boundaries come from planning.data.gov.uk, which publishes for England only.

Other built sites within 15 km

SiteMWDistance
Risley '4' Landfill Scheme
Landfill Gas · Operational
5.90.2 km
Risley Sets 13 & 14
Landfill Gas · Operational
2.10.3 km
Butchersfield Landfill Site
Landfill Gas · Operational
34.6 km
SAICA Paper Mill
Biomass (dedicated) · Operational
41.65.7 km
Whitehead Landfill
Landfill Gas · Operational
5.37 km
Warrington Home Solar Scheme
Solar Photovoltaics · Operational
5.38.7 km
Tesco Crab Tree Lane
Solar Photovoltaics · Operational
0.59.5 km
Atherton - Battery energy storage
Battery · Operational
309.9 km

How big is Risley?

Risley has a recorded installed capacity of 2 MW. That figure is the capacity registered in REPD, which is the scheme as consented — the metered output of a site can differ.

Who operates Risley?

REPD records the operator as Biffa. Ownership of built renewable assets changes hands regularly and REPD is published quarterly, so treat this as the operator of record rather than confirmation of who owns it today.

When was Risley approved and built?

The application was submitted on 2002-04-12. Permission was granted on 2003-06-01, 14 months later. The site became operational on 2003-11-01, 5 months after consent.

Source: Renewable Energy Planning Database (REPD), Department for Energy Security and Net Zero, Open Government Licence v3.0, plus planning designation boundaries from planning.data.gov.uk (England only). REPD is published quarterly and covers schemes of roughly 150 kW and above. Capacity is the installed capacity on record, not metered generation. Operator is the operator of record at the last extract, not confirmation of present ownership. Reference 778.

Novarly Parcel · official public data, read properly · parcel.novarly.com

All sites · Screen your own site · Planning by council