Redhall Industrial Estate is operational in East Riding of Yorkshire with a recorded capacity of 5 MW, and has been generating since 2014-08-08.

5 MW
Capacity
as recorded in REPD
Operational
Status
since 2014-08-08
Solar Photovoltaics
Technology
Dodds Limited
East Riding of Yorkshire
Authority
England

Planning and build timeline

Application submitted2012-10-22
Permission granted2013-01-21
3 months after submission
Operational2014-08-08
19 months after consent

What this site sits on

The recorded coordinate falls on land surveyed as Grade 2 agricultural land.

REPD gives one representative coordinate per scheme, not the site boundary, so this describes the point on record rather than the whole site — a large site can straddle a designation edge. Boundaries come from planning.data.gov.uk, which publishes for England only.

East Riding of Yorkshire’s record on solar

East Riding of Yorkshire has decided 57 solar farms and approved 100%, taking a median of 2.2 months. See every solar farm decision in East Riding of Yorkshire

Other built sites within 15 km

SiteMWDistance
Far Marsh Farm
Wind Onshore · Operational
7.54 km
Roos Wind Farm (Resubmission)
Wind Onshore · Operational
17.16.1 km
Tedder Hill Wind cluster
Wind Onshore · Operational
7.56.7 km
Burton Pidsea (Wadworth Hill) Wind Farm
Wind Onshore · Operational
10.26.7 km
Out Newton Wind Farm
Wind Onshore · Operational
911.2 km
Immingham Landfill Scheme
Landfill Gas · Operational
112.3 km
Immingham
Landfill Gas · Operational
212.3 km
Newlincs EfW
EfW Incineration · Operational
3.212.5 km

How big is Redhall Industrial Estate?

Redhall Industrial Estate has a recorded installed capacity of 5 MW. That figure is the capacity registered in REPD, which is the scheme as consented — the metered output of a site can differ.

Who operates Redhall Industrial Estate?

REPD records the operator as Dodds Limited. Ownership of built renewable assets changes hands regularly and REPD is published quarterly, so treat this as the operator of record rather than confirmation of who owns it today.

When was Redhall Industrial Estate approved and built?

The application was submitted on 2012-10-22. Permission was granted on 2013-01-21, 3 months later. The site became operational on 2014-08-08, 19 months after consent.

Source: Renewable Energy Planning Database (REPD), Department for Energy Security and Net Zero, Open Government Licence v3.0, plus planning designation boundaries from planning.data.gov.uk (England only). REPD is published quarterly and covers schemes of roughly 150 kW and above. Capacity is the installed capacity on record, not metered generation. Operator is the operator of record at the last extract, not confirmation of present ownership. Reference 2019.

Novarly Parcel · official public data, read properly · parcel.novarly.com

All sites · Screen your own site · Planning by council