Novarly ParcelRenewable sites

Renewable sitesRedhall Industrial Estate

Redhall Industrial Estate

Redhall Industrial Estate is an operational 5 MW solar farm in East Riding of Yorkshire, generating since 8 August 2014. Planning permission was granted on 21 January 2013, 3 months after submission. Operator of record: Dodds Limited.

5 MW
Capacity
as recorded in REPD
Operational
Status
since 8 August 2014
Solar Photovoltaics
Technology
Dodds Limited
East Riding of Yorkshire
Authority
England

Planning and build timeline

Application submitted22 October 2012
Permission granted21 January 2013
3 months after submission
Operational8 August 2014
19 months after consent

Screening a site of your own?

RedlineUK · £39

East Riding of Yorkshire approves 100% of solar farms. Redline puts that number, and everything else the record holds, against your own boundary: the authority’s actual approval rate and decision times, every designation inside the red line, agricultural grade, 1 m LIDAR earthworks, how contested the grid is, and yield with a P90 — before you spend on a consultant.

Screen a site here£39

Arrives prefilled with Redhall Industrial Estate’s recorded coordinate — swap in your own postcode or coordinates.

Consent ClockUK · Free

Granted years ago. Still not built. Every consented solar farm in the UK, computed against its statutory commencement deadline — which consents are about to lapse, and where.

Open Consent Clock →

What this site sits on

The recorded coordinate falls on land surveyed as Grade 2 agricultural land.

REPD gives one representative coordinate per scheme, not the site boundary, so this describes the point on record rather than the whole site — a large site can straddle a designation edge. Boundaries come from planning.data.gov.uk, which publishes for England only.

East Riding of Yorkshire’s record on solar

East Riding of Yorkshire has decided 57 solar farms and approved 100%, taking a median of 2.2 months. See every solar farm decision in East Riding of Yorkshire

Other built sites within 15 km

SiteMWDistance
Wind Onshore · Operational
7.54 km
Wind Onshore · Operational
17.16.1 km
Wind Onshore · Operational
7.56.7 km
Wind Onshore · Operational
10.26.7 km
Wind Onshore · Operational
911.2 km
Landfill Gas · Operational
212.3 km
Landfill Gas · Operational
112.3 km
EfW Incineration · Operational
3.212.5 km

How big is Redhall Industrial Estate?

Redhall Industrial Estate has a recorded installed capacity of 5 MW. That figure is the capacity registered in REPD, which is the scheme as consented — the metered output of a site can differ.

Who operates Redhall Industrial Estate?

REPD records the operator as Dodds Limited. Ownership of built renewable assets changes hands regularly and REPD is published quarterly, so treat this as the operator of record rather than confirmation of who owns it today.

When was Redhall Industrial Estate approved and built?

The application was submitted on 22 October 2012. Permission was granted on 21 January 2013, 3 months later. The site became operational on 8 August 2014, 19 months after consent.

Source: Renewable Energy Planning Database (REPD), Department for Energy Security and Net Zero, Open Government Licence v3.0, plus planning designation boundaries from planning.data.gov.uk (England only). REPD is published quarterly and covers schemes of roughly 150 kW and above. Capacity is the installed capacity on record, not metered generation. Operator is the operator of record at the last extract, not confirmation of present ownership. Reference 2019.

Novarly Parcel · official public data, read properly · parcel.novarly.com

All sites · Screen your own site · Planning by council · Coal mining search by postcode