Renewable sites › Roos Wind Farm (Resubmission)
Roos Wind Farm (Resubmission)
Roos Wind Farm (Resubmission) is an operational 17.1 MW onshore wind farm in East Riding of Yorkshire, generating since 2 April 2013. Planning permission was granted on 13 May 2010, 16 months after submission. Operator of record: Renewable Energy Systems (RES).
Planning and build timeline
| Application submitted | 20 January 2009 |
| Permission granted | 13 May 2010 16 months after submission |
| Operational | 2 April 2013 35 months after consent |
Screening a site of your own?
East Riding of Yorkshire approves 82% of onshore wind schemes. Redline puts that number, and everything else the record holds, against your own boundary: the authority’s actual approval rate and decision times, every designation inside the red line, agricultural grade, 1 m LIDAR earthworks, how contested the grid is, and yield with a P90 — before you spend on a consultant.
Arrives prefilled with Roos Wind Farm (Resubmission)’s recorded coordinate — swap in your own postcode or coordinates.
What this site sits on
The recorded coordinate falls on land surveyed as Grade 3 agricultural land. The published survey does not split Grade 3 into 3a and 3b, so this alone does not settle whether the land counts as best and most versatile.
REPD gives one representative coordinate per scheme, not the site boundary, so this describes the point on record rather than the whole site — a large site can straddle a designation edge. Boundaries come from planning.data.gov.uk, which publishes for England only.
East Riding of Yorkshire’s record on onshore wind
East Riding of Yorkshire has decided 55 onshore wind schemes and approved 82%, taking a median of 7.8 months. See every onshore wind scheme decision in East Riding of Yorkshire →
Other built sites within 15 km
| Site | MW | Distance |
|---|---|---|
Wind Onshore · Operational | 7.5 | 2.8 km |
Wind Onshore · Operational | 10.2 | 2.9 km |
Solar Photovoltaics · Operational | 5 | 6.1 km |
Wind Onshore · Operational | 7.5 | 8.8 km |
Biomass (dedicated) · Operational | 22 | 9 km |
Wind Onshore · Operational | 1.7 | 10.9 km |
Wind Onshore · Operational | 1.3 | 11 km |
Solar Photovoltaics · Under Construction | 25.7 | 11.5 km |
How big is Roos Wind Farm (Resubmission)?
Roos Wind Farm (Resubmission) has a recorded installed capacity of 17.1 MW. That figure is the capacity registered in REPD, which is the scheme as consented — the metered output of a site can differ.
Who operates Roos Wind Farm (Resubmission)?
REPD records the operator as Renewable Energy Systems (RES). Ownership of built renewable assets changes hands regularly and REPD is published quarterly, so treat this as the operator of record rather than confirmation of who owns it today.
When was Roos Wind Farm (Resubmission) approved and built?
The application was submitted on 20 January 2009. Permission was granted on 13 May 2010, 16 months later. The site became operational on 2 April 2013, 35 months after consent.
Source: Renewable Energy Planning Database (REPD), Department for Energy Security and Net Zero, Open Government Licence v3.0, plus planning designation boundaries from planning.data.gov.uk (England only). REPD is published quarterly and covers schemes of roughly 150 kW and above. Capacity is the installed capacity on record, not metered generation. Operator is the operator of record at the last extract, not confirmation of present ownership. Reference 3835.
Novarly Parcel · official public data, read properly · parcel.novarly.com
All sites · Screen your own site · Planning by council · Coal mining search by postcode