Out Newton Wind Farm

Out Newton Wind Farm is operational in East Riding of Yorkshire with a recorded capacity of 9 MW, and has been generating since 2002-01-31.

9 MW
Capacity
as recorded in REPD
Operational
Status
since 2002-01-31
Wind Onshore
Technology
Powergen Renewables Developments Ltd
East Riding of Yorkshire
Authority
England

Planning and build timeline

Application submitted1998-11-04
Permission granted2000-09-11
22 months after submission
Operational2002-01-31
17 months after consent

What this site sits on

The recorded coordinate falls on land surveyed as Grade 3 agricultural land. The published survey does not split Grade 3 into 3a and 3b, so this alone does not settle whether the land counts as best and most versatile.

REPD gives one representative coordinate per scheme, not the site boundary, so this describes the point on record rather than the whole site — a large site can straddle a designation edge. Boundaries come from planning.data.gov.uk, which publishes for England only.

East Riding of Yorkshire’s record on onshore wind

East Riding of Yorkshire has decided 55 onshore wind schemes and approved 82%, taking a median of 7.8 months. See every onshore wind scheme decision in East Riding of Yorkshire

Other built sites within 15 km

SiteMWDistance
Redhall Industrial Estate
Solar Photovoltaics · Operational
511.2 km
Tedder Hill Wind cluster
Wind Onshore · Operational
7.512.5 km
Far Marsh Farm
Wind Onshore · Operational
7.514.1 km
Roos Wind Farm (Resubmission)
Wind Onshore · Operational
17.114.5 km

How big is Out Newton Wind Farm?

Out Newton Wind Farm has a recorded installed capacity of 9 MW. That figure is the capacity registered in REPD, which is the scheme as consented — the metered output of a site can differ.

Who operates Out Newton Wind Farm?

REPD records the operator as Powergen Renewables Developments Ltd. Ownership of built renewable assets changes hands regularly and REPD is published quarterly, so treat this as the operator of record rather than confirmation of who owns it today.

When was Out Newton Wind Farm approved and built?

The application was submitted on 1998-11-04. Permission was granted on 2000-09-11, 22 months later. The site became operational on 2002-01-31, 17 months after consent.

Source: Renewable Energy Planning Database (REPD), Department for Energy Security and Net Zero, Open Government Licence v3.0, plus planning designation boundaries from planning.data.gov.uk (England only). REPD is published quarterly and covers schemes of roughly 150 kW and above. Capacity is the installed capacity on record, not metered generation. Operator is the operator of record at the last extract, not confirmation of present ownership. Reference 2659.