Rampton Hospital Energy Centre

Rampton Hospital Energy Centre is an operational 1.2 MW biomass plant in Bassetlaw, generating since 29 May 2015. Planning permission was granted on 6 February 2013, 1 months after submission. Operator of record: Cofely.

1.2 MW
Capacity
as recorded in REPD
Operational
Status
since 29 May 2015
Biomass (dedicated)
Technology
Cofely
Bassetlaw
Authority
England

Planning and build timeline

Application submitted24 December 2012
Permission granted6 February 2013
1 months after submission
Operational29 May 2015
28 months after consent

Screening a site of your own?

RedlineUK · £39

Redline runs the record on your own boundary in Bassetlaw: the authority’s actual approval rate and decision times, every designation inside the red line, agricultural grade, 1 m LIDAR earthworks, how contested the grid is, and yield with a P90 — before you spend on a consultant.

Screen a site here£39

Arrives prefilled with Rampton Hospital Energy Centre’s recorded coordinate — swap in your own postcode or coordinates.

Consent ClockUK · Free

Granted years ago. Still not built. Every consented solar, battery or onshore wind scheme in the UK, computed against its statutory commencement deadline — which consents are about to lapse, and where.

Open Consent Clock →

What this site sits on

The recorded coordinate falls on land surveyed as Grade 3 agricultural land. The published survey does not split Grade 3 into 3a and 3b, so this alone does not settle whether the land counts as best and most versatile.

REPD gives one representative coordinate per scheme, not the site boundary, so this describes the point on record rather than the whole site — a large site can straddle a designation edge. Boundaries come from planning.data.gov.uk, which publishes for England only.

Other built sites within 15 km

SiteMWDistance
Solar Photovoltaics · Operational
45.6 km
Battery · Operational
498.7 km
Solar Photovoltaics · Operational
88.7 km
Solar Photovoltaics · Operational
1.78.8 km
Biomass (dedicated) · Operational
128.9 km
Solar Photovoltaics · Operational
14.29.2 km
Solar Photovoltaics · Under Construction
49.99.3 km
Solar Photovoltaics · Operational
5.19.6 km

How big is Rampton Hospital Energy Centre?

Rampton Hospital Energy Centre has a recorded installed capacity of 1.2 MW. That figure is the capacity registered in REPD, which is the scheme as consented — the metered output of a site can differ.

Who operates Rampton Hospital Energy Centre?

REPD records the operator as Cofely. Ownership of built renewable assets changes hands regularly and REPD is published quarterly, so treat this as the operator of record rather than confirmation of who owns it today.

When was Rampton Hospital Energy Centre approved and built?

The application was submitted on 24 December 2012. Permission was granted on 6 February 2013, 1 months later. The site became operational on 29 May 2015, 28 months after consent.

Source: Renewable Energy Planning Database (REPD), Department for Energy Security and Net Zero, Open Government Licence v3.0, plus planning designation boundaries from planning.data.gov.uk (England only). REPD is published quarterly and covers schemes of roughly 150 kW and above. Capacity is the installed capacity on record, not metered generation. Operator is the operator of record at the last extract, not confirmation of present ownership. Reference 66.

Novarly Parcel · official public data, read properly · parcel.novarly.com