Renewable sites › West Burton
West Burton
West Burton is an operational 49 MW battery storage site in Bassetlaw, generating since 25 June 2018. REPD does not record the planning grant date. Operator of record: EDF Energy Renewables.
Planning and build timeline
| Application submitted | 11 July 2016 |
| Permission granted | not recorded |
| Operational | 25 June 2018 |
Screening a site of your own?
Bassetlaw approves 100% of battery storage schemes. Redline puts that number, and everything else the record holds, against your own boundary: the authority’s actual approval rate and decision times, every designation inside the red line, agricultural grade, 1 m LIDAR earthworks, how contested the grid is, and yield with a P90 — before you spend on a consultant.
Arrives prefilled with West Burton’s recorded coordinate — swap in your own postcode or coordinates.
What this site sits on
The recorded coordinate falls on land surveyed as Grade 3 agricultural land. The published survey does not split Grade 3 into 3a and 3b, so this alone does not settle whether the land counts as best and most versatile.
REPD gives one representative coordinate per scheme, not the site boundary, so this describes the point on record rather than the whole site — a large site can straddle a designation edge. Boundaries come from planning.data.gov.uk, which publishes for England only.
Bassetlaw’s record on battery storage
Bassetlaw has decided 7 battery storage schemes and approved 100%, taking a median of 3 months. See every battery storage scheme decision in Bassetlaw →
Other built sites within 15 km
| Site | MW | Distance |
|---|---|---|
Solar Photovoltaics · Operational | 3.3 | 8.2 km |
Solar Photovoltaics · Operational | 10.5 | 8.2 km |
Biomass (dedicated) · Operational | 1.2 | 8.7 km |
Solar Photovoltaics · Operational | 1.7 | 8.8 km |
Solar Photovoltaics · Operational | 8 | 8.9 km |
Solar Photovoltaics · Under Construction | 49.9 | 9.8 km |
Solar Photovoltaics · Operational | 4 | 10.6 km |
Anaerobic Digestion · Operational | 3 | 10.8 km |
How big is West Burton?
West Burton has a recorded installed capacity of 49 MW. That figure is the capacity registered in REPD, which is the scheme as consented — the metered output of a site can differ.
Who operates West Burton?
REPD records the operator as EDF Energy Renewables. Ownership of built renewable assets changes hands regularly and REPD is published quarterly, so treat this as the operator of record rather than confirmation of who owns it today.
When was West Burton approved and built?
The application was submitted on 11 July 2016. REPD does not record a grant date. The site became operational on 25 June 2018.
Source: Renewable Energy Planning Database (REPD), Department for Energy Security and Net Zero, Open Government Licence v3.0, plus planning designation boundaries from planning.data.gov.uk (England only). REPD is published quarterly and covers schemes of roughly 150 kW and above. Capacity is the installed capacity on record, not metered generation. Operator is the operator of record at the last extract, not confirmation of present ownership. Reference 6920.