West Burton

West Burton is operational in Bassetlaw with a recorded capacity of 49 MW, and has been generating since 2018-06-25.

49 MW
Capacity
as recorded in REPD
Operational
Status
since 2018-06-25
Battery
Technology
EDF Energy Renewables
Bassetlaw
Authority
England

Planning and build timeline

Application submitted2016-07-11
Permission grantednot recorded
Operational2018-06-25

What this site sits on

The recorded coordinate falls on land surveyed as Grade 3 agricultural land. The published survey does not split Grade 3 into 3a and 3b, so this alone does not settle whether the land counts as best and most versatile.

REPD gives one representative coordinate per scheme, not the site boundary, so this describes the point on record rather than the whole site — a large site can straddle a designation edge. Boundaries come from planning.data.gov.uk, which publishes for England only.

Bassetlaw’s record on battery storage

Bassetlaw has decided 7 battery storage schemes and approved 100%, taking a median of 3 months. See every battery storage scheme decision in Bassetlaw

Other built sites within 15 km

SiteMWDistance
Danes Farm - extension
Solar Photovoltaics · Operational
10.58.2 km
Danes Farm
Solar Photovoltaics · Operational
3.38.2 km
Rampton Hospital Energy Centre
Biomass (dedicated) · Operational
1.28.7 km
Tiln Farm Retford (extension)
Solar Photovoltaics · Operational
1.78.8 km
Tiln Farm solar park
Solar Photovoltaics · Operational
88.9 km
Tiln Farm Solar Farm
Solar Photovoltaics · Under Construction
49.99.8 km
Walmoor Farm solar park
Solar Photovoltaics · Operational
410.6 km
Sutton Grange AD Plant
Anaerobic Digestion · Operational
310.8 km

How big is West Burton?

West Burton has a recorded installed capacity of 49 MW. That figure is the capacity registered in REPD, which is the scheme as consented — the metered output of a site can differ.

Who operates West Burton?

REPD records the operator as EDF Energy Renewables. Ownership of built renewable assets changes hands regularly and REPD is published quarterly, so treat this as the operator of record rather than confirmation of who owns it today.

When was West Burton approved and built?

The application was submitted on 2016-07-11. REPD does not record a grant date. The site became operational on 2018-06-25.

Source: Renewable Energy Planning Database (REPD), Department for Energy Security and Net Zero, Open Government Licence v3.0, plus planning designation boundaries from planning.data.gov.uk (England only). REPD is published quarterly and covers schemes of roughly 150 kW and above. Capacity is the installed capacity on record, not metered generation. Operator is the operator of record at the last extract, not confirmation of present ownership. Reference 6920.