Renewable sites › James Paget University Hospital - Design And Installation Of PV Panels
James Paget University Hospital - Design And Installation Of PV Panels
James Paget University Hospital - Design And Installation Of PV Panels is under construction in Great Yarmouth.
Planning and build timeline
| Application submitted | not recorded |
| Permission granted | not recorded |
| Operational | not recorded |
What this site sits on
The recorded coordinate falls on land surveyed as Grade 1 agricultural land.
REPD gives one representative coordinate per scheme, not the site boundary, so this describes the point on record rather than the whole site — a large site can straddle a designation edge. Boundaries come from planning.data.gov.uk, which publishes for England only.
Great Yarmouth’s record on solar
Great Yarmouth has decided 8 solar farms and approved 100%, taking a median of 1.9 months. See every solar farm decision in Great Yarmouth →
Other built sites within 15 km
| Site | MW | Distance |
|---|---|---|
Ness point Wind Turbine 1 Wind Onshore · Operational | 2.3 | 9.5 km |
Scroby Sands� Wind Offshore · Operational | 60 | 10.3 km |
Nova Scotia Farm solar park Solar Photovoltaics · Operational | 13.9 | 11.2 km |
Priory Farm Solar Photovoltaics · Operational | 3.1 | 12.9 km |
How big is James Paget University Hospital - Design And Installation Of PV Panels?
REPD does not record an installed capacity for James Paget University Hospital - Design And Installation Of PV Panels.
Who operates James Paget University Hospital - Design And Installation Of PV Panels?
REPD records the operator as James Paget University Hospital Trust. Ownership of built renewable assets changes hands regularly and REPD is published quarterly, so treat this as the operator of record rather than confirmation of who owns it today.
When was James Paget University Hospital - Design And Installation Of PV Panels approved and built?
REPD does not record a submission date. REPD does not record a grant date. The site is recorded as under construction and has no operational date yet.
Source: Renewable Energy Planning Database (REPD), Department for Energy Security and Net Zero, Open Government Licence v3.0, plus planning designation boundaries from planning.data.gov.uk (England only). REPD is published quarterly and covers schemes of roughly 150 kW and above. Capacity is the installed capacity on record, not metered generation. Operator is the operator of record at the last extract, not confirmation of present ownership. Reference 17377.