Renewable sites › Priestgill Wind Farm
Priestgill Wind Farm
Priestgill Wind Farm is a 46.2 MW onshore wind farm under construction in South Lanarkshire. Planning permission was granted on 15 December 2021, 60 months after submission. Operator of record: Muirhall Energy.
Planning and build timeline
| Application submitted | 13 December 2016 |
| Permission granted | 15 December 2021 60 months after submission |
| Operational | not recorded |
Screening a site of your own?
South Lanarkshire approves 73% of onshore wind schemes. Redline puts that number, and everything else the record holds, against your own boundary: the authority’s actual approval rate and decision times, every designation inside the red line, agricultural grade, 1 m LIDAR earthworks, how contested the grid is, and yield with a P90 — before you spend on a consultant.
Arrives prefilled with Priestgill Wind Farm’s recorded coordinate — swap in your own postcode or coordinates.
South Lanarkshire’s record on onshore wind
South Lanarkshire has decided 49 onshore wind schemes and approved 73%, taking a median of 15.9 months. See every onshore wind scheme decision in South Lanarkshire →
Other built sites within 15 km
| Site | MW | Distance |
|---|---|---|
Wind Onshore · Operational | 172.8 | 6.5 km |
Wind Onshore · Operational | 51 | 9.7 km |
Wind Onshore · Operational | 350 | 10.3 km |
Wind Onshore · Under Construction | 57 | 10.9 km |
Wind Onshore · Operational | 36 | 12.4 km |
Wind Onshore · Operational | 48 | 14.7 km |
Wind Onshore · Operational | 22 | 14.9 km |
How big is Priestgill Wind Farm?
Priestgill Wind Farm has a recorded installed capacity of 46.2 MW. That figure is the capacity registered in REPD, which is the scheme as consented — the metered output of a site can differ.
Who operates Priestgill Wind Farm?
REPD records the operator as Muirhall Energy. Ownership of built renewable assets changes hands regularly and REPD is published quarterly, so treat this as the operator of record rather than confirmation of who owns it today.
When was Priestgill Wind Farm approved and built?
The application was submitted on 13 December 2016. Permission was granted on 15 December 2021, 60 months later. The site is recorded as under construction and has no operational date yet.
Source: Renewable Energy Planning Database (REPD), Department for Energy Security and Net Zero, Open Government Licence v3.0, plus planning designation boundaries from planning.data.gov.uk (England only). REPD is published quarterly and covers schemes of roughly 150 kW and above. Capacity is the installed capacity on record, not metered generation. Operator is the operator of record at the last extract, not confirmation of present ownership. Reference 6363.
Novarly Parcel · official public data, read properly · parcel.novarly.com
All sites · Screen your own site · Planning by council · Coal mining search by postcode