Priestgill Wind Farm

Priestgill Wind Farm is under construction in South Lanarkshire with a recorded capacity of 46.2 MW.

46.2 MW
Capacity
as recorded in REPD
Under Construction
Status
no operational date
Wind Onshore
Technology
Muirhall Energy
South Lanarkshire
Authority
Scotland

Planning and build timeline

Application submitted2016-12-13
Permission granted2021-12-15
60 months after submission
Operationalnot recorded

South Lanarkshire’s record on onshore wind

South Lanarkshire has decided 49 onshore wind schemes and approved 73%, taking a median of 15.9 months. See every onshore wind scheme decision in South Lanarkshire

Other built sites within 15 km

SiteMWDistance
Clyde Wind Farm Extension (Clyde 2)
Wind Onshore · Operational
172.86.5 km
Middle Muir Wind Farm
Wind Onshore · Operational
519.7 km
Clyde Wind Farm
Wind Onshore · Operational
35010.3 km
Whitelaw Brae Wind Farm
Wind Onshore · Under Construction
5710.9 km
Andershaw
Wind Onshore · Operational
3612.4 km
Broken Cross (Former Surface Mine)
Wind Onshore · Operational
4814.7 km
Glenkerie Wind Farm
Wind Onshore · Operational
2214.9 km

How big is Priestgill Wind Farm?

Priestgill Wind Farm has a recorded installed capacity of 46.2 MW. That figure is the capacity registered in REPD, which is the scheme as consented — the metered output of a site can differ.

Who operates Priestgill Wind Farm?

REPD records the operator as Muirhall Energy. Ownership of built renewable assets changes hands regularly and REPD is published quarterly, so treat this as the operator of record rather than confirmation of who owns it today.

When was Priestgill Wind Farm approved and built?

The application was submitted on 2016-12-13. Permission was granted on 2021-12-15, 60 months later. The site is recorded as under construction and has no operational date yet.

Source: Renewable Energy Planning Database (REPD), Department for Energy Security and Net Zero, Open Government Licence v3.0, plus planning designation boundaries from planning.data.gov.uk (England only). REPD is published quarterly and covers schemes of roughly 150 kW and above. Capacity is the installed capacity on record, not metered generation. Operator is the operator of record at the last extract, not confirmation of present ownership. Reference 6363.