Novarly ParcelRenewable sites

Renewable sitesPort of Barry - Site 2

Port of Barry - Site 2

Port of Barry - Site 2 is an operational 5 MW solar farm in Vale of Glamorgan, generating since 16 April 2015. Planning permission was granted on 15 April 2015, 26 months after submission. Operator of record: Associated British Ports (ABP).

5 MW
Capacity
as recorded in REPD
Operational
Status
since 16 April 2015
Solar Photovoltaics
Technology
Associated British Ports (ABP)
Vale of Glamorgan
Authority
Wales

Planning and build timeline

Application submitted18 February 2013
Permission granted15 April 2015
26 months after submission
Operational16 April 2015
0 months after consent

Screening a site of your own?

RedlineUK · £39

Vale of Glamorgan approves 96% of solar farms. Redline puts that number, and everything else the record holds, against your own boundary: the authority’s actual approval rate and decision times, every designation inside the red line, agricultural grade, 1 m LIDAR earthworks, how contested the grid is, and yield with a P90 — before you spend on a consultant.

Screen a site here£39

Arrives prefilled with Port of Barry - Site 2’s recorded coordinate — swap in your own postcode or coordinates.

Consent ClockUK · Free

Granted years ago. Still not built. Every consented solar farm in the UK, computed against its statutory commencement deadline — which consents are about to lapse, and where.

Open Consent Clock →

Vale of Glamorgan’s record on solar

Vale of Glamorgan has decided 25 solar farms and approved 96%, taking a median of 4.2 months. See every solar farm decision in Vale of Glamorgan

Other built sites within 15 km

SiteMWDistance
Solar Photovoltaics · Operational
4.50 km
Advanced Conversion Technologies · Operational
100.6 km
Solar Photovoltaics · Operational
53.2 km
Solar Photovoltaics · Operational
74.4 km
Solar Photovoltaics · Operational
54.7 km
Solar Photovoltaics · Operational
7.55.6 km
Solar Photovoltaics · Operational
67 km
Solar Photovoltaics · Operational
58 km

How big is Port of Barry - Site 2?

Port of Barry - Site 2 has a recorded installed capacity of 5 MW. That figure is the capacity registered in REPD, which is the scheme as consented — the metered output of a site can differ.

Who operates Port of Barry - Site 2?

REPD records the operator as Associated British Ports (ABP). Ownership of built renewable assets changes hands regularly and REPD is published quarterly, so treat this as the operator of record rather than confirmation of who owns it today.

When was Port of Barry - Site 2 approved and built?

The application was submitted on 18 February 2013. Permission was granted on 15 April 2015, 26 months later. The site became operational on 16 April 2015, 0 months after consent.

Source: Renewable Energy Planning Database (REPD), Department for Energy Security and Net Zero, Open Government Licence v3.0, plus planning designation boundaries from planning.data.gov.uk (England only). REPD is published quarterly and covers schemes of roughly 150 kW and above. Capacity is the installed capacity on record, not metered generation. Operator is the operator of record at the last extract, not confirmation of present ownership. Reference 5605.

Novarly Parcel · official public data, read properly · parcel.novarly.com

All sites · Screen your own site · Planning by council · Coal mining search by postcode