Renewable sites › Biglis Farm
Biglis Farm
Biglis Farm is an operational 5 MW solar farm in Vale of Glamorgan, generating since 31 March 2016. Planning permission was granted on 2 October 2015, 4 months after submission. Operator of record: Conergy West Sussex.
Planning and build timeline
| Application submitted | 28 May 2015 |
| Permission granted | 2 October 2015 4 months after submission |
| Operational | 31 March 2016 6 months after consent |
Screening a site of your own?
Vale of Glamorgan approves 96% of solar farms. Redline puts that number, and everything else the record holds, against your own boundary: the authority’s actual approval rate and decision times, every designation inside the red line, agricultural grade, 1 m LIDAR earthworks, how contested the grid is, and yield with a P90 — before you spend on a consultant.
Arrives prefilled with Biglis Farm’s recorded coordinate — swap in your own postcode or coordinates.
Vale of Glamorgan’s record on solar
Vale of Glamorgan has decided 25 solar farms and approved 96%, taking a median of 4.2 months. See every solar farm decision in Vale of Glamorgan →
Other built sites within 15 km
| Site | MW | Distance |
|---|---|---|
Advanced Conversion Technologies · Operational | 10 | 2.7 km |
Solar Photovoltaics · Operational | 4.5 | 3.2 km |
Solar Photovoltaics · Operational | 5 | 3.2 km |
Solar Photovoltaics · Operational | 7 | 4.8 km |
Solar Photovoltaics · Operational | 5 | 5 km |
Solar Photovoltaics · Operational | 5 | 5.3 km |
Solar Photovoltaics · Operational | 7.5 | 6.1 km |
Solar Photovoltaics · Operational | 6 | 6.2 km |
How big is Biglis Farm?
Biglis Farm has a recorded installed capacity of 5 MW. That figure is the capacity registered in REPD, which is the scheme as consented — the metered output of a site can differ.
Who operates Biglis Farm?
REPD records the operator as Conergy West Sussex. Ownership of built renewable assets changes hands regularly and REPD is published quarterly, so treat this as the operator of record rather than confirmation of who owns it today.
When was Biglis Farm approved and built?
The application was submitted on 28 May 2015. Permission was granted on 2 October 2015, 4 months later. The site became operational on 31 March 2016, 6 months after consent.
Source: Renewable Energy Planning Database (REPD), Department for Energy Security and Net Zero, Open Government Licence v3.0, plus planning designation boundaries from planning.data.gov.uk (England only). REPD is published quarterly and covers schemes of roughly 150 kW and above. Capacity is the installed capacity on record, not metered generation. Operator is the operator of record at the last extract, not confirmation of present ownership. Reference 5289.