Novarly ParcelRenewable sites

Renewable sitesPilsworth Quarry Landfill Scheme

Pilsworth Quarry Landfill Scheme

Pilsworth Quarry Landfill Scheme is an operational 4.1 MW landfill gas site in Bury, generating since 15 October 1998. Planning permission was granted on 19 May 1998, 5 months after submission. Operator of record: Terry Adams Ltd.

4.1 MW
Capacity
as recorded in REPD
Operational
Status
since 15 October 1998
Landfill Gas
Technology
Terry Adams Ltd
Bury
Authority
England

Planning and build timeline

Application submitted15 December 1997
Permission granted19 May 1998
5 months after submission
Operational15 October 1998
5 months after consent

Screening a site of your own?

RedlineUK · £39

Redline runs the record on your own boundary in Bury: the authority’s actual approval rate and decision times, every designation inside the red line, agricultural grade, 1 m LIDAR earthworks, how contested the grid is, and yield with a P90 — before you spend on a consultant.

Screen a site here£39

Arrives prefilled with Pilsworth Quarry Landfill Scheme’s recorded coordinate — swap in your own postcode or coordinates.

Consent ClockUK · Free

Granted years ago. Still not built. Every consented solar, battery or onshore wind scheme in the UK, computed against its statutory commencement deadline — which consents are about to lapse, and where.

Open Consent Clock →

What this site sits on

The recorded coordinate falls on land surveyed as Grade 3 agricultural land. The published survey does not split Grade 3 into 3a and 3b, so this alone does not settle whether the land counts as best and most versatile.

REPD gives one representative coordinate per scheme, not the site boundary, so this describes the point on record rather than the whole site — a large site can straddle a designation edge. Boundaries come from planning.data.gov.uk, which publishes for England only.

Other built sites within 15 km

SiteMWDistance
Liquid Air Energy Storage · Operational
51.1 km
Battery · Operational
202.9 km
Solar Photovoltaics · Under Construction
3.993.1 km
Battery · Under Construction
405.4 km
Battery · Under Construction
205.5 km
Landfill Gas · Operational
17.9 km
Battery · Under Construction
578.4 km
Battery · Under Construction
208.5 km

How big is Pilsworth Quarry Landfill Scheme?

Pilsworth Quarry Landfill Scheme has a recorded installed capacity of 4.1 MW. That figure is the capacity registered in REPD, which is the scheme as consented — the metered output of a site can differ.

Who operates Pilsworth Quarry Landfill Scheme?

REPD records the operator as Terry Adams Ltd. Ownership of built renewable assets changes hands regularly and REPD is published quarterly, so treat this as the operator of record rather than confirmation of who owns it today.

When was Pilsworth Quarry Landfill Scheme approved and built?

The application was submitted on 15 December 1997. Permission was granted on 19 May 1998, 5 months later. The site became operational on 15 October 1998, 5 months after consent.

Source: Renewable Energy Planning Database (REPD), Department for Energy Security and Net Zero, Open Government Licence v3.0, plus planning designation boundaries from planning.data.gov.uk (England only). REPD is published quarterly and covers schemes of roughly 150 kW and above. Capacity is the installed capacity on record, not metered generation. Operator is the operator of record at the last extract, not confirmation of present ownership. Reference 571.

Novarly Parcel · official public data, read properly · parcel.novarly.com

All sites · Screen your own site · Planning by council · Coal mining search by postcode