Renewable sites › Pilsworth Quarry Landfill Scheme
Pilsworth Quarry Landfill Scheme
Pilsworth Quarry Landfill Scheme is operational in Bury with a recorded capacity of 4.1 MW, and has been generating since 1998-10-15.
Planning and build timeline
| Application submitted | 1997-12-15 |
| Permission granted | 1998-05-19 5 months after submission |
| Operational | 1998-10-15 5 months after consent |
What this site sits on
The recorded coordinate falls on land surveyed as Grade 3 agricultural land. The published survey does not split Grade 3 into 3a and 3b, so this alone does not settle whether the land counts as best and most versatile.
- Green Belt — Bury
REPD gives one representative coordinate per scheme, not the site boundary, so this describes the point on record rather than the whole site — a large site can straddle a designation edge. Boundaries come from planning.data.gov.uk, which publishes for England only.
Other built sites within 15 km
| Site | MW | Distance |
|---|---|---|
Pilsworth Landfill Site Liquid Air Energy Storage · Operational | 5 | 1.1 km |
Lascar Works Battery · Operational | 20 | 2.9 km |
Chamber House Solar Photovoltaics · Under Construction | 3.99 | 3.1 km |
Astra Centre, Royal Barn Road - Energy Storage Battery · Under Construction | 40 | 5.4 km |
Gipsy Lane Battery · Under Construction | 20 | 5.5 km |
Clifton Hall Landfill Gas · Operational | 1 | 7.9 km |
Whitegate Battery Storage Battery · Under Construction | 57 | 8.4 km |
Chadderton - Battery energy storage facility Battery · Under Construction | 20 | 8.5 km |
How big is Pilsworth Quarry Landfill Scheme?
Pilsworth Quarry Landfill Scheme has a recorded installed capacity of 4.1 MW. That figure is the capacity registered in REPD, which is the scheme as consented — the metered output of a site can differ.
Who operates Pilsworth Quarry Landfill Scheme?
REPD records the operator as Terry Adams Ltd. Ownership of built renewable assets changes hands regularly and REPD is published quarterly, so treat this as the operator of record rather than confirmation of who owns it today.
When was Pilsworth Quarry Landfill Scheme approved and built?
The application was submitted on 1997-12-15. Permission was granted on 1998-05-19, 5 months later. The site became operational on 1998-10-15, 5 months after consent.
Source: Renewable Energy Planning Database (REPD), Department for Energy Security and Net Zero, Open Government Licence v3.0, plus planning designation boundaries from planning.data.gov.uk (England only). REPD is published quarterly and covers schemes of roughly 150 kW and above. Capacity is the installed capacity on record, not metered generation. Operator is the operator of record at the last extract, not confirmation of present ownership. Reference 571.