Renewable sites › Pilsworth Landfill Site
Pilsworth Landfill Site
Pilsworth Landfill Site is operational in Bury with a recorded capacity of 5 MW, and has been generating since 2018-06-05.
Planning and build timeline
| Application submitted | not recorded |
| Permission granted | not recorded |
| Operational | 2018-06-05 |
What this site sits on
The recorded coordinate falls on land surveyed as Grade 3 agricultural land. The published survey does not split Grade 3 into 3a and 3b, so this alone does not settle whether the land counts as best and most versatile.
- Green Belt — Bury
REPD gives one representative coordinate per scheme, not the site boundary, so this describes the point on record rather than the whole site — a large site can straddle a designation edge. Boundaries come from planning.data.gov.uk, which publishes for England only.
Other built sites within 15 km
| Site | MW | Distance |
|---|---|---|
Pilsworth Quarry Landfill Scheme Landfill Gas · Operational | 4.1 | 1.1 km |
Lascar Works Battery · Operational | 20 | 2.8 km |
Chamber House Solar Photovoltaics · Under Construction | 3.99 | 4 km |
Astra Centre, Royal Barn Road - Energy Storage Battery · Under Construction | 40 | 6.4 km |
Gipsy Lane Battery · Under Construction | 20 | 6.5 km |
Clifton Hall Landfill Gas · Operational | 1 | 6.9 km |
Whitegate Battery Storage Battery · Under Construction | 57 | 8.5 km |
Bent Spur Solar Farm Solar Photovoltaics · Operational | 5 | 8.6 km |
How big is Pilsworth Landfill Site?
Pilsworth Landfill Site has a recorded installed capacity of 5 MW. That figure is the capacity registered in REPD, which is the scheme as consented — the metered output of a site can differ.
Who operates Pilsworth Landfill Site?
REPD records the operator as Viridor/Highview Power Storage. Ownership of built renewable assets changes hands regularly and REPD is published quarterly, so treat this as the operator of record rather than confirmation of who owns it today.
When was Pilsworth Landfill Site approved and built?
REPD does not record a submission date. REPD does not record a grant date. The site became operational on 2018-06-05.
Source: Renewable Energy Planning Database (REPD), Department for Energy Security and Net Zero, Open Government Licence v3.0, plus planning designation boundaries from planning.data.gov.uk (England only). REPD is published quarterly and covers schemes of roughly 150 kW and above. Capacity is the installed capacity on record, not metered generation. Operator is the operator of record at the last extract, not confirmation of present ownership. Reference 6843.