Pilsworth Landfill Site is operational in Bury with a recorded capacity of 5 MW, and has been generating since 2018-06-05.

5 MW
Capacity
as recorded in REPD
Operational
Status
since 2018-06-05
Liquid Air Energy Storage
Technology
Viridor/Highview Power Storage
Bury
Authority
England

Planning and build timeline

Application submittednot recorded
Permission grantednot recorded
Operational2018-06-05

What this site sits on

The recorded coordinate falls on land surveyed as Grade 3 agricultural land. The published survey does not split Grade 3 into 3a and 3b, so this alone does not settle whether the land counts as best and most versatile.

REPD gives one representative coordinate per scheme, not the site boundary, so this describes the point on record rather than the whole site — a large site can straddle a designation edge. Boundaries come from planning.data.gov.uk, which publishes for England only.

Other built sites within 15 km

SiteMWDistance
Pilsworth Quarry Landfill Scheme
Landfill Gas · Operational
4.11.1 km
Lascar Works
Battery · Operational
202.8 km
Chamber House
Solar Photovoltaics · Under Construction
3.994 km
Astra Centre, Royal Barn Road - Energy Storage
Battery · Under Construction
406.4 km
Gipsy Lane
Battery · Under Construction
206.5 km
Clifton Hall
Landfill Gas · Operational
16.9 km
Whitegate Battery Storage
Battery · Under Construction
578.5 km
Bent Spur Solar Farm
Solar Photovoltaics · Operational
58.6 km

How big is Pilsworth Landfill Site?

Pilsworth Landfill Site has a recorded installed capacity of 5 MW. That figure is the capacity registered in REPD, which is the scheme as consented — the metered output of a site can differ.

Who operates Pilsworth Landfill Site?

REPD records the operator as Viridor/Highview Power Storage. Ownership of built renewable assets changes hands regularly and REPD is published quarterly, so treat this as the operator of record rather than confirmation of who owns it today.

When was Pilsworth Landfill Site approved and built?

REPD does not record a submission date. REPD does not record a grant date. The site became operational on 2018-06-05.

Source: Renewable Energy Planning Database (REPD), Department for Energy Security and Net Zero, Open Government Licence v3.0, plus planning designation boundaries from planning.data.gov.uk (England only). REPD is published quarterly and covers schemes of roughly 150 kW and above. Capacity is the installed capacity on record, not metered generation. Operator is the operator of record at the last extract, not confirmation of present ownership. Reference 6843.

Novarly Parcel · official public data, read properly · parcel.novarly.com

All sites · Screen your own site · Planning by council