Renewable sites › Pencloe Wind Farm
Pencloe Wind Farm
Pencloe Wind Farm is an 81 MW onshore wind farm under construction in Scotland. Planning permission was granted on 6 December 2018, 45 months after submission. Operator of record: North British Wind / Invenergy.
Planning and build timeline
| Application submitted | 26 February 2015 |
| Permission granted | 6 December 2018 45 months after submission |
| Operational | not recorded |
Screening a site of your own?
Redline runs the same record on your own boundary: the authority’s actual approval rate and decision times, every designation inside the red line, agricultural grade, 1 m LIDAR earthworks, how contested the grid is, and yield with a P90 — before you spend on a consultant.
Arrives prefilled with Pencloe Wind Farm’s recorded coordinate — swap in your own postcode or coordinates.
Scottish Government (S36)’s record on onshore wind
Scottish Government (S36) has decided 173 onshore wind schemes and approved 80%, taking a median of 33.7 months. See every onshore wind scheme decision in Scottish Government (S36) →
Other built sites within 15 km
| Site | MW | Distance |
|---|---|---|
Wind Onshore · Under Construction | 70 | 1.6 km |
Wind Onshore · Operational | 240 | 6.4 km |
Wind Onshore · Under Construction | 205.8 | 7.3 km |
Landfill Gas · Operational | 3 | 7.7 km |
Landfill Gas · Operational | 1.3 | 7.7 km |
Wind Onshore · Operational | 13.2 | 7.7 km |
Wind Onshore · Operational | 29.8 | 7.7 km |
Wind Onshore · Operational | 50 | 7.9 km |
How big is Pencloe Wind Farm?
Pencloe Wind Farm has a recorded installed capacity of 81 MW. That figure is the capacity registered in REPD, which is the scheme as consented — the metered output of a site can differ.
Who operates Pencloe Wind Farm?
REPD records the operator as North British Wind / Invenergy. Ownership of built renewable assets changes hands regularly and REPD is published quarterly, so treat this as the operator of record rather than confirmation of who owns it today.
When was Pencloe Wind Farm approved and built?
The application was submitted on 26 February 2015. Permission was granted on 6 December 2018, 45 months later. The site is recorded as under construction and has no operational date yet.
Source: Renewable Energy Planning Database (REPD), Department for Energy Security and Net Zero, Open Government Licence v3.0, plus planning designation boundaries from planning.data.gov.uk (England only). REPD is published quarterly and covers schemes of roughly 150 kW and above. Capacity is the installed capacity on record, not metered generation. Operator is the operator of record at the last extract, not confirmation of present ownership. Reference 4480.